Saundatti HEP (1260 MW) Integrated Renewable Energy with Pumped Storage Project is an approved water and irrigation project in Mallor, Savadatti, Belagavi, Karnataka. The site covers 2,123.1 acres.
Who is building it?
The applicant is Greenko Solar Energy Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 10 Mar 2025), as of 27 Nov 2026.
Where is it?
In Mallor, Savadatti, Belagavi, Karnataka.
How big is it?
It has a stated cost of ₹11,016 crore and a site of 2,123.1 acres.
When was it filed?
The application was filed on 22 Dec 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 10 Mar 2025 |
| Application filed | 22 Dec 2023 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Water & irrigation |
| Applicant | Greenko Solar Energy Private Limited |
| Land area | 2,123.1 acres (859.2 ha) |
| Project cost | ₹11,016 crore |
| Village / locality | Mallor |
| Taluk / tehsil | Savadatti |
| District | Belagavi |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-00525 |
In context
20 applications in Belagavi since January 2022 are in the same category (Water & irrigation): 1 approved, 13 filed or under review, and 6 withdrawn, lapsed or rejected. At 2,123.1 acres, this one is larger than 90% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mallor, Savadatti, Belagavi, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Saundatti HEP (Integrated Renewable Energy with Pumped Storage Project) — lapsed, 150 m away
- Saundatti IRESP - Storage Project — under environmental review, 300 m away
- Saundatti HEP Integrated Renewable Energy with Pumped Storage Project. — in-principle approval, conditions pending, 750 m away
- Saundatti IRESP - Storage Project — under environmental review, 950 m away
- Saundatti HEP (Integrated Renewable Energy with Pumped Storage Project) — withdrawn, 950 m away
- Ari Arjun Yallappa Hammini — environmental approval granted, 4.4 km away
- Diversion of forest land in Sy No.256 of Sogala, Sy No.3 of Kagihala Villages,… — in-principle approval, conditions pending, 5.9 km away
- Building Stone Quarry "M/s Prince M Sand" Partner: Sri. Lokesh Venkatesh — environmental approval granted, 6.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.