Saundatti HEP (Integrated Renewable Energy with Pumped Storage Project) is a withdrawn water and irrigation project in Yekkundi, Savadatti, Belagavi, Karnataka. The site covers 759.7 acres.
Who is building it?
The applicant is Greenko KA01 IREP Private Limited.
Has it been approved?
No. The application was withdrawn on 27 Feb 2026, so it is no longer under consideration.
Where is it?
In Yekkundi, Savadatti, Belagavi, Karnataka.
How big is it?
It has a stated cost of ₹11,016 crore and a site of 759.7 acres.
When was it filed?
The application was filed on 27 Feb 2026.
Project details
| Status | Withdrawn |
|---|---|
| Status since | 27 Feb 2026 |
| Application filed | 27 Feb 2026 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Water & irrigation |
| Applicant | Greenko KA01 IREP Private Limited |
| Land area | 759.7 acres (307.4 ha) |
| Project cost | ₹11,016 crore |
| Village / locality | Yekkundi |
| Taluk / tehsil | Savadatti |
| District | Belagavi |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-04422 |
In context
20 applications in Belagavi since January 2022 are in the same category (Water & irrigation): 1 approved, 13 filed or under review, and 6 withdrawn, lapsed or rejected. At 759.7 acres, this one is larger than 65% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Yekkundi, Savadatti, Belagavi, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Saundatti IRESP - Storage Project — under environmental review, 0 m away
- Saundatti HEP Integrated Renewable Energy with Pumped Storage Project. — in-principle approval, conditions pending, 650 m away
- Saundatti HEP (1260 MW) Integrated Renewable Energy with Pumped Storage Project — environmental approval granted, 950 m away
- Saundatti HEP (Integrated Renewable Energy with Pumped Storage Project) — lapsed, 950 m away
- Saundatti IRESP - Storage Project — under environmental review, 1.2 km away
- Ari Arjun Yallappa Hammini — environmental approval granted, 3.5 km away
- Diversion of forest land in Sy No.256 of Sogala, Sy No.3 of Kagihala Villages,… — in-principle approval, conditions pending, 5.3 km away
- Building Stone Quarry "M/s Prince M Sand" Partner: Sri. Lokesh Venkatesh — environmental approval granted, 6 km away
More from Greenko KA01 IREP Private Limited in Belagavi
- Saundatti IRESP - Storage Project — under environmental review
- Saundatti IRESP - Storage Project — under environmental review
- Saundatti HEP (Integrated Renewable Energy with Pumped Storage Project) — lapsed
- Saundatti HEP Integrated Renewable Energy with Pumped Storage Project. — in-principle approval, conditions pending
All 5 Greenko KA01 IREP projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.