Quick answers
What is this project?
Itagi Limestone Mine (ML Area: 519.0 Ha) with Expansion in Limestone Production Capacity 3.0 Million TPA to 7.5 Million TPA, Top Soil 0.1 Million TPA, Over Burden 0.2 Million TPA (Total Excavation: 7.8 Million TPA) is a proposed mining project in Itgi, Chittapur, Kalaburagi, Karnataka. The site covers 1,282.5 acres.
Who is building it?
The applicant is Orient Cement Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 16 Jun 2023), as of 27 Nov 2026.
Where is it?
In Itgi, Chittapur, Kalaburagi, Karnataka.
How big is it?
It has a stated cost of ₹56 crore and a site of 1,282.5 acres.
When was it filed?
The application was filed on 12 May 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Itagi Limestone Mine (ML Area: 519.0 Ha) with Expansion in Limestone Production Capacity…
Project details
| Official title | Itagi Limestone Mine (ML Area: 519.0 Ha) with Expansion in Limestone Production Capacity 3.0 Million TPA to 7.5 Million TPA, Top Soil 0.1 Million TPA, Over Burden 0.2 Million TPA (Total Excavation: 7.8 Million TPA) along with one existing Crusher of 1200 TPH Capacity & Installation of one additional Crusher of 1200 TPH Capacity located at Villages: Itagi & Mogla, Tehsil: Chittapur, District: Kalaburagi, State: Karnataka |
|---|---|
| Status | Cleared for impact study |
| Status since | 16 Jun 2023 |
| Application filed | 12 May 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Orient Cement Limited |
| Land area | 1,282.5 acres (519 ha) |
| Project cost | ₹56 crore |
| Village / locality | Itgi |
| Taluk / tehsil | Chittapur |
| District | Kalaburagi |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-00584 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 30 Aug 2024 | Environmental approval granted | 1,282.5 acres | ₹56 crore |
| Early planning filed 12 May 2023 (this page) | Cleared for impact study | 1,282.5 acres | ₹56 crore |
In context
94 applications in Kalaburagi since January 2022 are in the same category (Mining): 71 approved, 12 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 1,282.5 acres, this one is larger than 89% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Itgi, Chittapur, Kalaburagi, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Itagi Limestone Mine (ML Area: 519.0 Ha) with Expansion in Limestone… — environmental approval granted, 150 m away
- Increase in Production Capacity of Clinker from 20,00,000 TPA to 22,01,027 TPA… — initial checks, 1.9 km away
- Expansion of Integrated Cement Plant - Clinker (2.1125 to 5.0 Million TPA),… — environmental approval granted, 2 km away
- Expansion of Integrated Cement Plant - Clinker (2.1125 to 5.0 Million TPA),… — cleared for impact study, 2 km away
- Expansion of Integrated Cement Plant - Clinker (2.0 to 5.0 Million TPA),… — withdrawn, 2 km away
- Proposed Cement Plant (Clinker- 2 MTPA; Cement 3.0 MTPA) and Captive Power… — environmental approval granted, 2 km away
- Proposed Diggaon Limestone Block (ML Area – 786.32 ha) with Limestone… — environmental approval granted, 4.4 km away
- Proposed Diggaon Limestone Block (ML Area – 786.32 ha) with Limestone… — cleared for impact study, 4.4 km away
More from Orient Cement Limited in Kalaburagi
- Increase in Production Capacity of Clinker from 20,00,000 TPA to 22,01,027 TPA… — initial checks
- Expansion of Integrated Cement Plant - Clinker (2.1125 to 5.0 Million TPA),… — environmental approval granted
- Expansion of Integrated Cement Plant - Clinker (2.1125 to 5.0 Million TPA),… — cleared for impact study
- Expansion of Integrated Cement Plant - Clinker (2.0 to 5.0 Million TPA),… — withdrawn
- Proposed Cement Plant (Clinker- 2 MTPA; Cement 3.0 MTPA) and Captive Power… — environmental approval granted
7 Orient Cement projects in Kalaburagi
All 11 Orient Cement projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.