What is Developing? Open the mapMap

Cleared for impact studyMining · Kalaburagi, Karnataka

Proposed Diggaon Limestone Block (ML Area – 786.32 ha) with Limestone Production Capacity 5.1 Million TPA, Top soil 0.03 Million TPA and Over Burden 0.36 Million TPA (Total excavation 5.49 Million TPA)

Proposed Diggaon Limestone Block (ML Area – 786.32 ha) with Limestone Production Capacity 5.1 Million TPA, Top soil 0.03 Million TPA and Over Burden 0.36 Million TPA (Total excavation 5.49 Million TPA) is a proposed mining project in Digaon, Chittapur, Kalaburagi, Karnataka. The site covers 1,943 acres. Its stated project cost is ₹644.7 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 25 Sept 2023).

See it on the live map All projects in Kalaburagi

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Diggaon Limestone Block (ML Area – 786.32 ha) with Limestone Production Capacity 5.1 Million TPA, Top soil 0.03 Million TPA and Over Burden 0.36 Million TPA (Total excavation 5.49 Million TPA) is a proposed mining project in Digaon, Chittapur, Kalaburagi, Karnataka. The site covers 1,943 acres.

Who is building it?

The applicant is UltraTech Cement Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 25 Sept 2023), as of 27 Nov 2026.

Where is it?

In Digaon, Chittapur, Kalaburagi, Karnataka.

How big is it?

It has a stated cost of ₹644.7 crore and a site of 1,943 acres.

When was it filed?

The application was filed on 3 Aug 2023.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Diggaon Limestone Block (ML Area – 786.32 ha) with Limestone Production…

Project details

Official titleProposed Diggaon Limestone Block (ML Area – 786.32 ha) with Limestone Production Capacity 5.1 Million TPA, Top soil 0.03 Million TPA and Over Burden 0.36 Million TPA (Total excavation 5.49 Million TPA) along with Crusher of capacity 1200 TPH & Wobbler of 400 TPH at Villages- Diggaon, Tehsil- Chittapur, District- Kalaburagi, Karnataka.
StatusCleared for impact study
Status since25 Sept 2023
Application filed3 Aug 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantUltraTech Cement Limited
Land area1,943 acres (786.3 ha)
Project cost₹644.7 crore
Village / localityDigaon
Taluk / tehsilChittapur
DistrictKalaburagi
StateKarnataka
Location fromSite boundary on record
Our referenceWID-KA-00361

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 30 Aug 2025Environmental approval granted1,943 acres₹644.7 crore
Early planning filed 3 Aug 2023 (this page)Cleared for impact study1,943 acres₹644.7 crore

In context

94 applications in Kalaburagi since January 2022 are in the same category (Mining): 71 approved, 12 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 1,943 acres, this one is larger than 96% of them.

No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.

Where it is

Digaon, Chittapur, Kalaburagi, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from UltraTech Cement Limited in Kalaburagi

11 UltraTech Cement projects in Kalaburagi
All 182 UltraTech Cement projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.