Quick answers
What is this project?
Proposed Kerur Lift Irrigation Scheme Project at Ghataprabha River, Near Annadinni Village, Bagalkot Taluk and District by M/s Krishna Bhagya Jala Nigam Limited is a lapsed water and irrigation project in Kerkalmatti, Badami, Bagalkote, Karnataka. The site covers 1,17,067.5 acres.
Who is building it?
The applicant is Krishna Bhagya Jala Nigama Limited.
Has it been approved?
No. The application was lapsed on 29 Oct 2024, so it is no longer under consideration.
Where is it?
In Kerkalmatti, Badami, Bagalkote, Karnataka.
How big is it?
It has a stated cost of ₹525 crore and a site of 1,17,067.5 acres.
When was it filed?
The application was filed on 1 Jun 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 29 Oct 2024 |
| Application filed | 1 Jun 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Krishna Bhagya Jala Nigama Limited |
| Land area | 1,17,067.5 acres (47,375.6 ha) |
| Project cost | ₹525 crore |
| Village / locality | Kerkalmatti |
| Taluk / tehsil | Badami |
| District | Bagalkote |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-02688 |
In context
14 applications in Bagalkote since January 2022 are in the same category (Water & irrigation): 2 approved, 5 filed or under review, and 7 withdrawn, lapsed or rejected. At 1,17,067.5 acres, this one is larger than 93% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kerkalmatti, Badami, Bagalkote, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Building stone Quarry "Smt. Deepa Hiremath" — lapsed, 2.5 km away
- Building Stone Quarry — under environmental review, 4.8 km away
- Laying of Pipeline From Adagala to Kabbalageri for Drinking Water Purpose — lapsed, 7.3 km away
- Expansion of 200 KLPD ENA/RS/Ethanol with cane syrup/molasses based to 700… — cleared for impact study, 9.4 km away
- Transfer of Distillery Section in the Environment Clearance Granted for the… — environmental approval granted, 9.6 km away
- Transfer of Distillery Section in the Environment Clearance Granted for the… — lapsed, 9.6 km away
- Transfer of Distillery Section in the Environment Clearance Granted for the… — withdrawn, 9.6 km away
- New Distillery Unit of 200 Klpd Capacity and Expansion of Sugar Plant From… — environmental approval granted, 9.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.