Quick answers
What is Building stone Quarry "Smt. Deepa Hiremath"?
Building stone Quarry "Smt. Deepa Hiremath" is a lapsed mining project in Hullikeri, Badami, Bagalkote, Karnataka. The site covers 5.6 acres.
Who is building it?
The applicant is Deepa Hiremath.
Has it been approved?
No. The application was lapsed on 26 Nov 2026, so it is no longer under consideration.
Where is it?
In Hullikeri, Badami, Bagalkote, Karnataka.
How big is it?
It has a stated cost of ₹60 lakh and a site of 5.6 acres.
When was it filed?
The application was filed on 9 Jun 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 26 Nov 2026 |
| Application filed | 9 Jun 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Deepa Hiremath |
| Land area | 5.6 acres (2.3 ha) |
| Project cost | ₹60 lakh |
| Village / locality | Hullikeri |
| Taluk / tehsil | Badami |
| District | Bagalkote |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-04760 |
In context
150 applications in Bagalkote since January 2022 are in the same category (Mining): 99 approved, 11 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 5.6 acres, this one is smaller than 62% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Hullikeri, Badami, Bagalkote, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Kerur Lift Irrigation Scheme Project at Ghataprabha River, Near… — lapsed, 2.5 km away
- Building Stone Quarry — under environmental review, 4.9 km away
- Laying of Pipeline From Adagala to Kabbalageri for Drinking Water Purpose — lapsed, 8 km away
- "Sand Stone Quarry" of Sri. Shivanna S Ramadurga — environmental approval granted, 9.2 km away
- Expansion of 200 KLPD ENA/RS/Ethanol with cane syrup/molasses based to 700… — cleared for impact study, 10.7 km away
- "Building Stone Quarry" — environmental approval granted, 10.9 km away
- Transfer of Distillery Section in the Environment Clearance Granted for the… — environmental approval granted, 11 km away
- Transfer of Distillery Section in the Environment Clearance Granted for the… — lapsed, 11 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.