What is Developing? Open the mapMap

Cleared for impact studyIndustry · Bagalkote, Karnataka

Proposed Expansion of Distillery Plant Capacity From 245 Klpd to 450 Klpd to Produce 450 Klpd Ethanol Or 180 Klpd Ena and 270 Klpd Ethanol Using Grains( Maize Or Rice) and Captive Power Plant Capacity 8.4 MW at Survey Nos. 92, 93, 94 and 89

Proposed Expansion of Distillery Plant Capacity From 245 Klpd to 450 Klpd to Produce 450 Klpd Ethanol Or 180 Klpd Ena and 270 Klpd Ethanol Using Grains( Maize Or Rice) and Captive Power Plant Capacity 8.4 MW at Survey Nos. 92, 93, 94 and 89 is a proposed industrial project in Hulageri, Badami, Bagalkote, Karnataka. The site covers 40 acres. Its stated project cost is ₹314.3 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 17 Feb 2025).

See it on the live map All projects in Bagalkote

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Expansion of Distillery Plant Capacity From 245 Klpd to 450 Klpd to Produce 450 Klpd Ethanol Or 180 Klpd Ena and 270 Klpd Ethanol Using Grains( Maize Or Rice) and Captive Power Plant Capacity 8.4 MW at Survey Nos. 92, 93, 94 and 89 is a proposed industrial project in Hulageri, Badami, Bagalkote, Karnataka. The site covers 40 acres.

Who is building it?

The applicant is Karthik Agro Industries Private Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 17 Feb 2025), as of 27 Nov 2026.

Where is it?

In Hulageri, Badami, Bagalkote, Karnataka.

How big is it?

It has a stated cost of ₹314.3 crore and a site of 40 acres.

When was it filed?

The application was filed on 10 Feb 2025.

Project details

Official titleProposed Expansion of Distillery Plant Capacity From 245 Klpd to 450 Klpd to Produce 450 Klpd Ethanol Or 180 Klpd Ena and 270 Klpd Ethanol Using Grains( Maize Or Rice) and Captive Power Plant Capacity 8.4 MW at Survey Nos. 92, 93, 94 and 89 in Hoolageri Village, Badami Taluk, Bagalkot District, Karnataka
StatusCleared for impact study
Status since17 Feb 2025
Application filed10 Feb 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantKarthik Agro Industries Private Limited
Land area40 acres (16.2 ha)
Project cost₹314.3 crore
Village / localityHulageri
Taluk / tehsilBadami
DistrictBagalkote
StateKarnataka
Location fromSite boundary on record
Our referenceWID-KA-03028

In context

61 applications in Bagalkote since January 2022 are in the same category (Industry): 39 approved, 11 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 40 acres, this one is smaller than 74% of them.

10 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Hulageri, Badami, Bagalkote, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Karthik Agro Industries Private Limited in Bagalkote

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.