Quick answers
What is this project?
Kagalagomb Quartz Mine (M.L.No.2452) of M/s. Jumanal Mining Minerals is a withdrawn mining project in Kagalgomb, Badami, Bagalkote, Karnataka. The site covers 7.8 acres.
Who is building it?
The applicant is Jumanal Mining Minerals.
Has it been approved?
No. The application was withdrawn on 2 Jun 2026, so it is no longer under consideration.
Where is it?
In Kagalgomb, Badami, Bagalkote, Karnataka.
How big is it?
It has a stated cost of ₹40 lakh and a site of 7.8 acres.
When was it filed?
The application was filed on 2 Jun 2026.
Project details
| Status | Withdrawn |
|---|---|
| Status since | 2 Jun 2026 |
| Application filed | 2 Jun 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Jumanal Mining Minerals |
| Land area | 7.8 acres (3.2 ha) |
| Project cost | ₹40 lakh |
| Village / locality | Kagalgomb |
| Taluk / tehsil | Badami |
| District | Bagalkote |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-05859 |
In context
150 applications in Bagalkote since January 2022 are in the same category (Mining): 99 approved, 11 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 7.8 acres, this one is larger than 60% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Kagalgomb, Badami, Bagalkote, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Kerur Lift Irrigation Project (drinking water purpose) — more information requested, 1.3 km away
- Mining of Dolomite in Syo no. 217/1, Over an area of 8.559 Ha (21.06 acres) by… — environmental approval granted, 3 km away
- Mining of Dolomite in Syo no. 217/1, Over an area of 8.559 Ha (21.06 acres) by… — cleared for impact study, 3 km away
- Proposed Expansion of Distillery Plant Capacity From 245 Klpd to 450 Klpd to… — environmental approval granted, 3.4 km away
- Proposed Expansion of Distillery Plant Capacity From 245 Klpd to 450 Klpd to… — cleared for impact study, 3.4 km away
- Multi Village Drinking WSS covering all Rural habitations of Bagalkot, Bilagi,… — under forest review, 4.5 km away
- Multi Village Drinking WSS covering all Rural habitations of Bagalkot, Bilagi,… — more information requested, 4.5 km away
- Expansion of MRN Ayurvedic Medical College, Hospital & Research Center by… — lapsed, 5.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.