Quick answers
What is this project?
Proposed Expansion of Distillery Plant Capacity From 245 Klpd to 450 Klpd to Produce 450 Klpd Ethanol Or 180 Klpd Ena and 270 Klpd Ethanol Using Grains( Maize Or Rice) and Captive Power Plant Capacity 8.4 MW at Survey Nos. 92, 93, 94 and 89 is an approved industrial project in Kerkalmatti, Badami, Bagalkote, Karnataka. The site covers 40 acres.
Who is building it?
The applicant is Karthik Agro Industries Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 3 Aug 2026), as of 27 Nov 2026.
Where is it?
In Kerkalmatti, Badami, Bagalkote, Karnataka.
How big is it?
It has a stated cost of ₹314.3 crore and a site of 40 acres.
When was it filed?
The application was filed on 30 Apr 2026.
Project details
| Official title | Proposed Expansion of Distillery Plant Capacity From 245 Klpd to 450 Klpd to Produce 450 Klpd Ethanol Or 180 Klpd Ena and 270 Klpd Ethanol Using Grains( Maize Or Rice) and Captive Power Plant Capacity 8.4 MW at Survey Nos. 92, 93, 94 and 89 in Hoolageri Village, Badami Taluk, Bagalkot District, Karnataka |
|---|---|
| Status | Environmental approval granted |
| Status since | 3 Aug 2026 |
| Application filed | 30 Apr 2026 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Karthik Agro Industries Private Limited |
| Land area | 40 acres (16.2 ha) |
| Project cost | ₹314.3 crore |
| Village / locality | Kerkalmatti |
| Taluk / tehsil | Badami |
| District | Bagalkote |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-05770 |
In context
61 applications in Bagalkote since January 2022 are in the same category (Industry): 39 approved, 11 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 40 acres, this one is smaller than 74% of them.
10 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kerkalmatti, Badami, Bagalkote, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Expansion of Distillery Plant Capacity From 245 Klpd to 450 Klpd to… — cleared for impact study, 0 m away
- Kerur Lift Irrigation Project (drinking water purpose) — more information requested, 2.1 km away
- Kagalagomb Quartz Mine (M.L.No.2452) of M/s. Jumanal Mining Minerals — withdrawn, 3.4 km away
- Multi Village Drinking WSS covering all Rural habitations of Bagalkot, Bilagi,… — under forest review, 3.5 km away
- Multi Village Drinking WSS covering all Rural habitations of Bagalkot, Bilagi,… — more information requested, 3.5 km away
- Expansion of MRN Ayurvedic Medical College, Hospital & Research Center by… — lapsed, 4.2 km away
- Expansion of Sugar Mill (3500 TCD to 15000 TCD), Co-generation Power Plant (15… — lapsed, 4.8 km away
- Expansion of Sugar Mill (3500 TCD to 15000 TCD), Co-generation Power Plant (15… — cleared for impact study, 4.8 km away
More from Karthik Agro Industries Private Limited in Bagalkote
- Proposed Expansion of Distillery Plant Capacity From 245 Klpd to 450 Klpd to… — cleared for impact study