Environmental approval grantedIndustry · Bagalkote, Karnataka

Expansion of Sugarcane Crushing Capacity From 5000 Tcd to 15000 Tcd to Produce Sugarcane Syrup/Crystal Sugar, Cogeneration Plant of 30 MW and Expansion of Distillery From 200 Klpd to 500 Klpd With Multi Feedstock (Sugar Syrup/B / C - Heavy Molasses/ Grain) to Produce Ethanol/Ena and Captive Power Plant From 7.5 MW to 13 MW by M/S. Mellbro Sugars PVT. LTD.

Expansion of Sugarcane Crushing Capacity From 5000 Tcd to 15000 Tcd to Produce Sugarcane Syrup/Crystal Sugar, Cogeneration Plant of 30 MW and Expansion of Distillery From 200 Klpd to 500 Klpd With Multi Feedstock (Sugar Syrup/B / C - Heavy Molasses/ Grain) to Produce Ethanol/Ena and Captive Power Plant From 7.5 MW to 13 MW by M/S. Mellbro Sugars PVT. LTD is an approved industrial project in Sirur, Bagalkot, Bagalkote, Karnataka. The site covers 106.6 acres. Its stated project cost is ₹994.6 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 26 Dec 2025).

See it on the live map All projects in Bagalkote

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Expansion of Sugarcane Crushing Capacity From 5000 Tcd to 15000 Tcd to Produce Sugarcane Syrup/Crystal Sugar, Cogeneration Plant of 30 MW and Expansion of Distillery From 200 Klpd to 500 Klpd With Multi Feedstock (Sugar Syrup/B / C - Heavy Molasses/ Grain) to Produce Ethanol/Ena and Captive Power Plant From 7.5 MW to 13 MW by M/S. Mellbro Sugars PVT. LTD is an approved industrial project in Sirur, Bagalkot, Bagalkote, Karnataka. The site covers 106.6 acres.

Who is building it?

The applicant is Mellbro Sugars Private Limited.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 26 Dec 2025), as of 27 Nov 2026.

Where is it?

In Sirur, Bagalkot, Bagalkote, Karnataka.

How big is it?

It has a stated cost of ₹994.6 crore and a site of 106.6 acres.

When was it filed?

The application was filed on 1 Aug 2025.

One of 3 filings for this project. The project's main page, with every filing and where each stands: Expansion of Sugarcane Crushing Capacity From 5000 Tcd to 15000 Tcd to Produce Sugarcane…

Project details

StatusEnvironmental approval granted
Status since26 Dec 2025
Application filed1 Aug 2025
Approval soughtEnvironmental approval
Application typeExpansion
SectorIndustry
ApplicantMellbro Sugars Private Limited
Land area106.6 acres (43.1 ha)
Project cost₹994.6 crore
Village / localitySirur
Taluk / tehsilBagalkot
DistrictBagalkote
StateKarnataka
Location fromSite boundary on record
Our referenceWID-KA-03679

All filings for this project

This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 1 Aug 2025 (this page)Environmental approval granted106.6 acres₹994.6 crore
Expansion filed 9 Apr 2025Returned to applicant106.6 acres₹994.6 crore
Early planning filed 21 Jun 2024Cleared for impact study106.6 acres₹994.6 crore

In context

61 applications in Bagalkote since January 2022 are in the same category (Industry): 39 approved, 11 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 106.6 acres, this one is larger than 66% of them.

Where it is

Sirur, Bagalkot, Bagalkote, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 3 Mellbro Sugars projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.