Quick answers
What is this project?
Expansion of Sugarcane Crushing Capacity From 5000 Tcd to 15000 Tcd to Produce Sugarcane Syrup/Crystal Sugar, Cogeneration Plant of 30 MW and Expansion of Distillery From 200 Klpd to 500 Klpd With Multi Feedstock (Sugar Syrup/B / C - Heavy Molasses/ Grain) to Produce Ethanol/Ena and Captive Power Plant From 7.5 MW to 13 MW by M/S. Mellbro Sugars PVT. LTD is a proposed industrial project in Sirur, Bagalkot, Bagalkote, Karnataka. The site covers 106.6 acres.
Who is building it?
The applicant is Mellbro Sugars Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Returned to applicant”, as of 27 Nov 2026.
Where is it?
In Sirur, Bagalkot, Bagalkote, Karnataka.
How big is it?
It has a stated cost of ₹994.6 crore and a site of 106.6 acres.
When was it filed?
The application was filed on 9 Apr 2025.
One of 3 filings for this project. The project's main page, with every filing and where each stands: Expansion of Sugarcane Crushing Capacity From 5000 Tcd to 15000 Tcd to Produce Sugarcane…
Project details
| Status | Returned to applicant |
|---|---|
| Status since | 13 May 2025 |
| Application filed | 9 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Mellbro Sugars Private Limited |
| Land area | 106.6 acres (43.1 ha) |
| Project cost | ₹994.6 crore |
| Village / locality | Sirur |
| Taluk / tehsil | Bagalkot |
| District | Bagalkote |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-03887 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 1 Aug 2025 | Environmental approval granted | 106.6 acres | ₹994.6 crore |
| Expansion filed 9 Apr 2025 (this page) | Returned to applicant | 106.6 acres | ₹994.6 crore |
| Early planning filed 21 Jun 2024 | Cleared for impact study | 106.6 acres | ₹994.6 crore |
In context
61 applications in Bagalkote since January 2022 are in the same category (Industry): 39 approved, 11 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 106.6 acres, this one is larger than 66% of them.
Where it is
Sirur, Bagalkot, Bagalkote, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Sugarcane Crushing Capacity From 5000 Tcd to 15000 Tcd to Produce… — environmental approval granted, 0 m away
- Expansion of Sugarcane Crushing Capacity From 5000 Tcd to 15000 Tcd to Produce… — cleared for impact study, 0 m away
- Construct an Alternative Road From Kamatagi Town to Shubodaya Pre-Primary &… — lapsed, 5.1 km away
- "Ordinary Sand Mining" of Sri. Ramesh Shivanand Yadawad — environmental approval granted, 7.8 km away
- Bhagavathi Lift Irrigation Scheme Near Mugalalli Village, Bagalkot Taluk &… — environmental approval granted, 8.8 km away
- Shirur Dolomite Mines Sri Shivanand S Melligeri — lapsed, 8.8 km away
- Improvement of road from Honnakatti to Old Mallapur upto Shri. Mallikarjun… — lapsed, 10.4 km away
- Mineral Beneficiation plant by M/s Doddanavar Brothers — cleared for impact study, 10.6 km away