Quick answers
What is Industrial project by APL Apollo Tubes Limited?
This lapsed industrial project by APL Apollo Tubes Limited is in Bavanahalli, Malur, Kolar, Karnataka. The site covers 30 acres.
Who is building it?
The applicant is Rahul Gupta.
Has it been approved?
No. The application was lapsed on 6 Sept 2025, so it is no longer under consideration.
Where is it?
In Bavanahalli, Malur, Kolar, Karnataka.
How big is it?
It has a stated cost of ₹349.8 crore and a site of 30 acres.
When was it filed?
The application was filed on 21 Jul 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 6 Sept 2025 |
| Application filed | 21 Jul 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Rahul Gupta |
| Land area | 30 acres (12.1 ha) |
| Project cost | ₹349.8 crore |
| Village / locality | Bavanahalli |
| Taluk / tehsil | Malur |
| District | Kolar |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-04062 |
In context
14 applications in Kolar since January 2022 are in the same category (Industry): 10 approved, 2 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 30 acres, this one is smaller than 57% of them.
33 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bavanahalli, Malur, Kolar, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- River EV 2 Wheelers Assembling Facility — initial checks, 700 m away
- Proposed in House Resin Manufacturing for Laminate Sheet Industry — environmental approval granted, 850 m away
- Apl Apollo Building Products Limited — more information requested, 1.5 km away
- Jakkasandra Industrial Area Phase-II (Mindahalli) — environmental approval granted, 1.9 km away
- Formation of Bavanahalli Industrial Area, Sy.No. 259, 245, 239, 247, 238, 258,… — environmental approval granted, 1.9 km away
- Formation of Bavanahalli Industrial Area, Sy.No. 259, 245, 239, 247, 238, 258,… — cleared for impact study, 1.9 km away
- Proposed "Warehousing, Industrial and Logistics Park" project by M/s. ILV… — under environmental review, 2 km away
- "Factory -E, EV Two Wheeler & Parts" by M/s. Honda Motorcycle and Scooter… — under environmental review, 2.1 km away
More from Rahul Gupta in Kolar
- Industrial project by Apl Apollo Tubes Limited — environmental approval granted
- Industrial project by Apl Apollo Tubes Limited — more information requested
- Industrial project by Apollo Tricoat Tubes Limited — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.