Project details
| Official title | Proposed Expansion by modification of Sponge Iron configuration of 4 X 100 TPD, Changed Induction Furnace capacity of 2 X 20 T, enhancement of Rolling Mill capacity of 145000 TPA with enhanced Captive Power Plant of 19 MW (WHRB – 9 MW + AFBC – 10 MW) and dropping off the Iron Ore Beneficiation Plant (0.6 MTPA), by M/s. Bhadrashree Steel and Power Limited at Kunikeri village, Koppal Taluk & District, Karnataka over an area of 30 Ac (12.14 Ha). |
|---|---|
| Status | Environmental approval granted |
| Status since | 30 Nov 2025 |
| Application filed | 25 Jul 2025 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Bhadrashree Steel & Power Limited |
| Land area | 30 acres (12.1 ha) |
| Project cost | ₹219.4 crore |
| Village / locality | Kunikeri |
| Taluk / tehsil | Koppal |
| District | Koppal |
| State | Karnataka |
| Location from | Site area on record |
| Our reference | WID-KA-04156 |
In context
48 applications in Koppal since January 2022 are in the same category (Industry): 28 approved, 16 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 30 acres, this one is smaller than 75% of them.
18 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kunikeri, Koppal, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Kunakeri Building Stone Quarry — environmental approval granted, 950 m away
- Expansion of Sponge Iron Unit from 200 TPD (2X100 TPD) to 550 TPD (1X350 TPD),… — more information requested, 2.2 km away
- Expansion of Sponge Iron Unit from 200 TPD (2X100 TPD) to 550 TPD (1X350 TPD),… — returned to applicant, 2.2 km away
- Expansion of Sponge Iron Unit from 200 TPD (2X100 TPD) to 550 TPD (1X350 TPD),… — cleared for impact study, 2.2 km away
- Integrated Steel Plant with Iron Ore Beneficiation Plant – 20,20,000 TPA,… — returned to applicant, 2.3 km away
- Mini Integrated Steel Plant by M/s. Kasturi Ispat Pvt Ltd — environmental approval granted, 2.3 km away
- Iron Ore Beneficiation Plant of 20,20,000 TPA, Pelletization Plant of… — cleared for impact study, 2.3 km away
- Environmental Clearance for Expansion of Sponge Iron (DRI) from 300 TPD to 800… — cleared for impact study, 2.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.