Returned to applicantIndustry · Koppal, Karnataka

Expansion of Sponge Iron Unit from 200 TPD (2X100 TPD) to 550 TPD (1X350 TPD), Captive Co-gen Power Plant from 10 MW to 20 MW and Establishment of 6 Lakh Tonnes Per Year Iron Ore Pellet Plant with Coal gasifier, 1.3 Lakh Tonnes Per Year TMT rebar and other steel products by M/s. Dhruvdesh Metasteel Pvt. Ltd.

Expansion of Sponge Iron Unit from 200 TPD (2X100 TPD) to 550 TPD (1X350 TPD), Captive Co-gen Power Plant from 10 MW to 20 MW and Establishment of 6 Lakh Tonnes Per Year Iron Ore Pellet Plant with Coal gasifier, 1.3 Lakh Tonnes Per Year TMT rebar and other steel products by M/s. Dhruvdesh Metasteel Pvt. Ltd is a proposed industrial project in Chikka Bagnalu, Koppal, Karnataka. The site covers 84.2 acres. Its stated project cost is ₹545.8 crore. As of 27 Nov 2026, its status is “Returned to applicant” (since 30 May 2026).

See it on the live map All projects in Koppal

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 3 filings for this project. The project's main page, with every filing and where each stands: Expansion of Sponge Iron Unit from 200 TPD (2X100 TPD) to 550 TPD (1X350 TPD), Captive…

Project details

StatusReturned to applicant
Status since30 May 2026
Application filed8 Apr 2026
Approval soughtEnvironmental approval
Application typeExpansion
SectorIndustry
ApplicantDhruvdesh Metasteel (Private) Limited
Land area84.2 acres (34.1 ha)
Project cost₹545.8 crore
Village / localityChikka Bagnalu
Taluk / tehsilKoppal
DistrictKoppal
StateKarnataka
Location fromSite boundary on record
Our referenceWID-KA-04340

All filings for this project

This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 3 Nov 2026More information requested84.2 acres₹545.8 crore
Expansion filed 8 Apr 2026 (this page)Returned to applicant84.2 acres₹545.8 crore
Early planning filed 24 Nov 2022Cleared for impact study84.2 acres₹545.8 crore

In context

48 applications in Koppal since January 2022 are in the same category (Industry): 28 approved, 16 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 84.2 acres, this one is smaller than 52% of them.

27 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Chikka Bagnalu, Koppal, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 3 Dhruvdesh Metasteel (Private) projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.