Diversion of forest land in Survey No. 17 of Hosahalli village ,Survey no : 55 of Yerabail Village(Uttar kannada dist.) & Survey no : 42 & 83 of Hulaganakoppa Village(dharward dist.) for Construction of 33Kv Transmission Line & laying of Underground Power Cable pertains to filling up of 129 Tanks , by Lifting Water from Bedthi River for Providing Drinking Water and Recharging Ground Water Table

Diversion of forest land in Survey No. 17 of Hosahalli village ,Survey no : 55 of Yerabail Village(Uttar kannada dist.) & Survey no : 42 & 83 of Hulaganakoppa Village(dharward dist.) for Construction of 33Kv Transmission Line & laying of Underground Power Cable pertains to filling up of 129 Tanks , by Lifting Water from Bedthi River for Providing Drinking Water and Recharging Ground Water Table is a lapsed power project in Yerebail, Mundgod, Uttara Kannada, Karnataka. The site covers 5 acres. Its stated project cost is ₹289.1 crore. As of 27 Nov 2026, its status is “Lapsed” (since 24 Nov 2026).

See it on the live map All projects in Uttara Kannada

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Diversion of forest land in Survey No. 17 of Hosahalli village ,Survey no : 55 of Yerabail Village(Uttar kannada dist.) & Survey no : 42 & 83 of Hulaganakoppa Village(dharward dist.) for Construction of 33Kv Transmission Line & laying of Underground Power Cable pertains to filling up of 129 Tanks , by Lifting Water from Bedthi River for Providing Drinking Water and Recharging Ground Water Table is a lapsed power project in Yerebail, Mundgod, Uttara Kannada, Karnataka. The site covers 5 acres.

Who is building it?

The applicant is Department of Irrigation.

Has it been approved?

No. The application was lapsed on 24 Nov 2026, so it is no longer under consideration.

Where is it?

In Yerebail, Mundgod, Uttara Kannada, Karnataka.

How big is it?

It has a stated cost of ₹289.1 crore; a site of 5 acres and 4.6 acres (1.9 ha) of forest land.

When was it filed?

The application was filed on 26 Nov 2025.

Project details

Official titleProposal for diversion of forest land in Survey No. 17 of Hosahalli village ,Survey no : 55 of Yerabail Village(Uttar kannada dist.) & Survey no : 42 & 83 of Hulaganakoppa Village(dharward dist.) for Construction of 33Kv Transmission Line & laying of Underground Power Cable pertains to filling up of 129 Tanks , by Lifting Water from Bedthi River for Providing Drinking Water and Recharging Ground Water Table in Mundgod Taluk, Uttar Kannada District.
StatusLapsed
Status since24 Nov 2026
Application filed26 Nov 2025
Approval soughtForest land use
Application typeNew project
SectorPower
ApplicantDepartment of Irrigation
Land area5 acres (2 ha)
Forest land4.6 acres (1.9 ha)
Project cost₹289.1 crore
Village / localityYerebail
Taluk / tehsilMundgod
DistrictUttara Kannada
StateKarnataka
Location fromSite boundary on record
Our referenceWID-KA-06011

In context

16 applications in Uttara Kannada since January 2022 are in the same category (Power): 0 approved, 10 filed or under review, and 4 withdrawn, lapsed or rejected. At 5 acres, this one is smaller than 100% of them.

Where it is

Yerebail, Mundgod, Uttara Kannada, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Department of Irrigation in Uttara Kannada

51 Department of Irrigation, Karnataka projects in Uttara Kannada
All 61 Department of Irrigation, Karnataka projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.