What is Developing? Open the mapMap

LapsedBuildings & townships · Uttara Kannada, Karnataka

Diversion of 12.329 Ha of Forest land in Bankasali, Mainalli, Madanuru, Kiravatti, Kanchanalli, Sahasralli, Heggapura, Hosahalli, Kannadagal and Kolikeri Villages of Uttara kannada dist, for construction of Diversion Weir, Jackwell cum Pump House, Electrical substation, One-way surge tanks and laying of risingmain and pressure distribution pipe network for Filling up of 50 MI/ZP Tanks (Phase-I),By Lifting Water from Bedthi River

Diversion of 12.329 Ha of Forest land in Bankasali, Mainalli, Madanuru, Kiravatti, Kanchanalli, Sahasralli, Heggapura, Hosahalli, Kannadagal and Kolikeri Villages of Uttara kannada dist, for construction of Diversion Weir, Jackwell cum Pump House, Electrical substation, One-way surge tanks and laying of risingmain and pressure distribution pipe network for Filling up of 50 MI/ZP Tanks (Phase-I),By Lifting Water from Bedthi River is a lapsed building project in Hosalli, Yellapur, Uttara Kannada, Karnataka. The site covers 33.9 acres. Its stated project cost is ₹166.3 crore. As of 27 Nov 2026, its status is “Lapsed” (since 24 Nov 2026).

See it on the live map All projects in Uttara Kannada

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Diversion of 12.329 Ha of Forest land in Bankasali, Mainalli, Madanuru, Kiravatti, Kanchanalli, Sahasralli, Heggapura, Hosahalli, Kannadagal and Kolikeri Villages of Uttara kannada dist, for construction of Diversion Weir, Jackwell cum Pump House, Electrical substation, One-way surge tanks and laying of risingmain and pressure distribution pipe network for Filling up of 50 MI/ZP Tanks (Phase-I),By Lifting Water from Bedthi River is a lapsed building project in Hosalli, Yellapur, Uttara Kannada, Karnataka. The site covers 33.9 acres.

Who is building it?

The applicant is Department of Irrigation.

Has it been approved?

No. The application was lapsed on 24 Nov 2026, so it is no longer under consideration.

Where is it?

In Hosalli, Yellapur, Uttara Kannada, Karnataka.

How big is it?

It has a stated cost of ₹166.3 crore; a site of 33.9 acres and 30.5 acres (12.3 ha) of forest land.

When was it filed?

The application was filed on 24 May 2026.

Project details

Official titleProposal for Diversion of 12.329 Ha of Forest land in Bankasali, Mainalli, Madanuru, Kiravatti, Kanchanalli, Sahasralli, Heggapura, Hosahalli, Kannadagal and Kolikeri Villages of Uttara kannada dist, for construction of Diversion Weir, Jackwell cum Pump House, Electrical substation, One-way surge tanks and laying of risingmain and pressure distribution pipe network for Filling up of 50 MI/ZP Tanks (Phase-I),By Lifting Water from Bedthi River in Yallapur and Mundgod Taluk, Uttar Kannada District
StatusLapsed
Status since24 Nov 2026
Application filed24 May 2026
Approval soughtForest land use
Application typeNew project
SectorBuildings & townships
ApplicantDepartment of Irrigation
Land area33.9 acres (13.7 ha)
Forest land30.5 acres (12.3 ha)
Project cost₹166.3 crore
Village / localityHosalli
Taluk / tehsilYellapur
DistrictUttara Kannada
StateKarnataka
Location fromSite boundary on record
Our referenceWID-KA-06892

In context

93 applications in Uttara Kannada since January 2022 are in the same category (Buildings & townships): 6 approved, 27 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 33.9 acres, this one is larger than 90% of them.

3 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Hosalli, Yellapur, Uttara Kannada, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Department of Irrigation in Uttara Kannada

51 Department of Irrigation, Karnataka projects in Uttara Kannada
All 61 Department of Irrigation, Karnataka projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.