Quick answers
What is Bsnl 4g Saturation Tower Project Ofc Route Aveda Popalwadi?
Bsnl 4g Saturation Tower Project Ofc Route Aveda Popalwadi is a proposed telecom project in Aveda, Supa, Uttara Kannada, Karnataka. The site covers 0.2 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
Not yet. The application is still under review: its status is “Under forest review”, as of 27 Nov 2026.
Where is it?
In Aveda, Supa, Uttara Kannada, Karnataka.
How big is it?
It has a stated cost of ₹50 lakh; a site of 0.2 acres and 1,040 m² of forest land.
When was it filed?
The application was filed on 17 Apr 2026.
One of 3 filings for this project. The project's main page, with every filing and where each stands: Bsnl 4g Saturation Tower Project Ofc Route Aveda Popalwadi
Project details
| Status | Under forest review |
|---|---|
| Status since | 11 Jun 2026 |
| Application filed | 17 Apr 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Land area | 1,000 m² |
| Forest land | 1,040 m² |
| Project cost | ₹50 lakh |
| Village / locality | Aveda |
| Taluk / tehsil | Supa |
| District | Uttara Kannada |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-06150 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 17 Apr 2026 (this page) | Under forest review | 0.2 acres | ₹50 lakh |
| Change of use filed 6 Jan 2025 | Lapsed | ₹50 lakh | |
| New project filed 18 Jul 2024 | Decision issued | 0.2 acres | ₹50 lakh |
In context
529 applications in Uttara Kannada since January 2022 are in the same category (Telecom): 181 approved, 43 filed or under review, and 277 withdrawn, lapsed or rejected. The approved ones took a median of 11 months from filing to approval. At 0.2 acres, this one is larger than 59% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Aveda, Supa, Uttara Kannada, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bsnl 4g Saturation Tower Project Ofc Route Aveda Popalwadi — decision issued, 0 m away
- Bsnl 4g Saturation Tower Project Ofc Route Aveda Popalwadi — lapsed, 200 m away
- Bsnl 4g Saturation Project at Aveda Poppalwadi — decision issued, 1.1 km away
- Bsnl 4g Saturation Project at Aveda Poppalwadi — forest land use approved, 1.1 km away
- Bsnl 4g Saturation Project Ofc Route Kuveshi — lapsed, 2.6 km away
- Bsnl 4g Saturation Project Ofc Route Kuveshi — lapsed, 2.6 km away
- Bsnl 4g Saturation Project Ofc Route Kuveshi — decision issued, 2.6 km away
- Bsnl 4g Saturation Project — lapsed, 2.6 km away
More from Mahesh Nair in Uttara Kannada
- Bsnl 4g Saturation Project Underground Optical Fiber Laying for Kanur,… — initial checks
- Optical Fiber Cable Laying Under 4g Satuaration Project for Achave Kuntakani… — under wildlife review
- Bsnl Usof 4g Saturation Project — under forest review
- Bsnl 4g Saturation Project Ofc Route Veeranjol, Palada, Vatla Form E — under forest review
- Optical Fiber Cable Laying by Bharath Sanchar Nigam LTD for Connectivity to 4g… — more information requested
- Bsnl 4g Saturation Project Underground Optical Fiber Laying for Heggumbale,… — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.