Quick answers
What is this project?
Optical Fiber Cable Laying Under 4g Satuaration Project for Achave Kuntakani and Motigudda 4g Bts Sites is a proposed telecom project in Achave, Ankola, Uttara Kannada, Karnataka. The site covers 1.2 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
Not yet. The application is still under review: its status is “Under wildlife review”, as of 27 Nov 2026.
Where is it?
In Achave, Ankola, Uttara Kannada, Karnataka.
How big is it?
It has a stated cost of ₹30 lakh and a site of 1.2 acres.
When was it filed?
The application was filed on 13 Oct 2026.
Project details
| Official title | Proposal for Optical Fiber Cable Laying Under 4g Satuaration Project for Achave Kuntakani and Motigudda 4g Bts Sites |
|---|---|
| Status | Under wildlife review |
| Status since | 13 Oct 2026 |
| Application filed | 13 Oct 2026 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Land area | 1.2 acres (0.5 ha) |
| Project cost | ₹30 lakh |
| Village / locality | Achave |
| Taluk / tehsil | Ankola |
| District | Uttara Kannada |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-08155 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 13 Oct 2026 (this page) | Under wildlife review | 1.2 acres | ₹30 lakh |
| New project filed 28 Aug 2025 | Lapsed | 1.2 acres | ₹30 lakh |
In context
529 applications in Uttara Kannada since January 2022 are in the same category (Telecom): 181 approved, 43 filed or under review, and 277 withdrawn, lapsed or rejected. The approved ones took a median of 11 months from filing to approval. At 1.2 acres, this one is larger than 94% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Achave, Ankola, Uttara Kannada, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Optical Fiber Cable Laying Under 4g Satuaration Project for Achave Kuntakani… — lapsed, 0 m away
- Providing FHTC's to 603 Households in Asnir & other 8 Habitation — lapsed, 1.3 km away
- Optical Fiber Cable Laying by Bharath Sanchar Nigam LTD for Connectivity to 4g… — lapsed, 1.5 km away
- Bsnl 4g Saturation Project Motigudda — under wildlife review, 1.6 km away
- Bsnl 4g Saturation Project Motigudda — forest land use approved, 1.6 km away
- Bsnl 4g Saturation Tower Project Devanamane — forest land use approved, 5.1 km away
- Building Stone Quarry Q.L.no570 — lapsed, 8.9 km away
- OPTICAL FIBER CABLE LAYING BY BHARATH SANCHAR NIGAM LTD FOR CONNECTIVITY TO 4G… — lapsed, 8.9 km away
More from Mahesh Nair in Uttara Kannada
- Bsnl 4g Saturation Project Underground Optical Fiber Laying for Kanur,… — initial checks
- Bsnl Usof 4g Saturation Project — under forest review
- Bsnl 4g Saturation Project Ofc Route Veeranjol, Palada, Vatla Form E — under forest review
- Optical Fiber Cable Laying by Bharath Sanchar Nigam LTD for Connectivity to 4g… — more information requested
- Bsnl 4g Saturation Tower Project Ofc Route Aveda Popalwadi — under forest review
- Bsnl 4g Saturation Project Underground Optical Fiber Laying for Heggumbale,… — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.