Quick answers
What is this project?
Optical Fiber Cable Laying by Bharath Sanchar Nigam LTD for Connectivity to 4g Towers Under 4g Saturation Project With Extent of 0.5 M in Forest/Nonforest Area for Site is a proposed building project in Basolli, Kumta, Uttara Kannada, Karnataka. The site covers 0.3 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Basolli, Kumta, Uttara Kannada, Karnataka.
How big is it?
It has a stated cost of ₹95 lakh and a site of 0.3 acres.
When was it filed?
The application was filed on 17 Apr 2026.
Project details
| Official title | Proposal for Optical Fiber Cable Laying by Bharath Sanchar Nigam LTD for Connectivity to 4g Towers Under 4g Saturation Project With Extent of 0.5 M in Forest/Nonforest Area for Site at Bassoli Village,kumta Taluk,uk Dist |
|---|---|
| Status | More information requested |
| Status since | 17 Apr 2026 |
| Application filed | 17 Apr 2026 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Mahesh Nair |
| Land area | 1,300 m² |
| Project cost | ₹95 lakh |
| Village / locality | Basolli |
| Taluk / tehsil | Kumta |
| District | Uttara Kannada |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-08124 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 17 Apr 2026 (this page) | More information requested | 0.3 acres | ₹95 lakh |
| New project filed 23 Jan 2025 | More information requested | 0.3 acres | ₹95 lakh |
| Change of use filed 11 Jul 2024 | Lapsed | 0.3 acres | ₹95 lakh |
In context
93 applications in Uttara Kannada since January 2022 are in the same category (Buildings & townships): 6 approved, 27 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.3 acres, this one is smaller than 68% of them.
33 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Basolli, Kumta, Uttara Kannada, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Optical Fiber Cable Laying by Bharath Sanchar Nigam LTD for Connectivity to 4g… — more information requested, 900 m away
- Optical Fiber Cable Laying by Bharath Sanchar Nigam LTD for Connectivity to 4g… — lapsed, 900 m away
- USOF 4G Saturation project in Kumta Taluka — lapsed, 950 m away
- USOF 4G Saturation project in Kumta Taluka — lapsed, 950 m away
- USOF 4G Saturation project in Kumta Taluka — lapsed, 950 m away
- USOF 4G Saturation project in Kumta Taluka — lapsed, 950 m away
- USOF 4G Saturation project in Kumta Taluka — lapsed, 950 m away
- USOF 4G Saturation project in Kumta Taluka — lapsed, 950 m away
More from Mahesh Nair in Uttara Kannada
- Bsnl 4g Saturation Project Underground Optical Fiber Laying for Kanur,… — initial checks
- Optical Fiber Cable Laying Under 4g Satuaration Project for Achave Kuntakani… — under wildlife review
- Bsnl Usof 4g Saturation Project — under forest review
- Bsnl 4g Saturation Project Ofc Route Veeranjol, Palada, Vatla Form E — under forest review
- Bsnl 4g Saturation Tower Project Ofc Route Aveda Popalwadi — under forest review
- Bsnl 4g Saturation Project Underground Optical Fiber Laying for Heggumbale,… — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.