Quick answers
What is this project?
Diversion of forest land in Ankola and Karwar Taluks of Uttara Kannada District, for laying of Underground Optical Fiber Cable Within the Right of Way (ROW) of road in favour of Dinesh Engineers Limited, Bengaluru is a lapsed telecom project in Hattikeri, Ankola, Uttara Kannada, Karnataka. The site covers 3.8 acres.
Who is building it?
The applicant is Dinesh Engineers Limited.
Has it been approved?
No. The application was lapsed on 22 Nov 2026, so it is no longer under consideration.
Where is it?
In Hattikeri, Ankola, Uttara Kannada, Karnataka.
How big is it?
It has a stated cost of ₹60 lakh; a site of 3.8 acres and 2,760 m² of forest land.
When was it filed?
The application was filed on 28 May 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 22 Nov 2026 |
| Application filed | 28 May 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Dinesh Engineers Limited |
| Land area | 3.8 acres (1.5 ha) |
| Forest land | 2,760 m² |
| Project cost | ₹60 lakh |
| Village / locality | Hattikeri |
| Taluk / tehsil | Ankola |
| District | Uttara Kannada |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-06321 |
In context
529 applications in Uttara Kannada since January 2022 are in the same category (Telecom): 181 approved, 43 filed or under review, and 277 withdrawn, lapsed or rejected. The approved ones took a median of 11 months from filing to approval. At 3.8 acres, this one is larger than 98% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Hattikeri, Ankola, Uttara Kannada, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Request for Crz Clearance of Proposed Maintenance Dredging at Existing… — coastal clearance granted, 2.1 km away
- Renewal of Water Tank to an Extent of 0.09 Ha — lapsed, 2.1 km away
- Diversion of 0.2568 ha of Forest land — initial checks, 6.5 km away
- CRZ NOC for Mentainance Dredging at fish landing centres at Harwada and… — lapsed, 6.7 km away
- Request for Crz Clearance of Proposed Maintenance Dredging at Existing Fish… — coastal clearance granted, 6.7 km away
- Construction 110KV Transmission line from 220KV Grid sub station Shejawada to… — more information requested, 7.5 km away
- Renewal of Diversion of 0.7552 Ha of Forest Land in F.S.No.52a1 of Arga in… — more information requested, 7.8 km away
- Rennewal of Diversion of 0.494 Ha. of Forest Land in F.S.No.52a of Arga in… — lapsed, 7.8 km away
More from Dinesh Engineers Limited in Uttara Kannada
- Application for Forest and Wildlife Clearance for the Purpose of Laying of… — lapsed
- Diversion of forest land in Honnavara to Mahime Villages of Honnavara Taluk,… — more information requested
- Application for Forest and Wildlife Clearance for the Purpose of Laying of… — more information requested
- Diversion of forest land in Honnavara, Siddapura and Kumta Taluks of Uttara… — lapsed
- Diversion of forest land — lapsed
6 Dinesh Engineers projects in Uttara Kannada
All 31 Dinesh Engineers projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.