Quick answers
What is this project?
CRZ NOC for Mentainance Dredging at fish landing centres at Harwada and Belekeri in Ankola taluka of Uttara Kannada District is a lapsed port and coastal project in Belekeri, Ankola, Uttara Kannada, Karnataka. The site covers 38.9 acres.
Who is building it?
The applicant is Additional Director of Fisheries, Fishing Harbours Malpe.
Has it been approved?
No. The application was lapsed on 10 Apr 2026, so it is no longer under consideration.
Where is it?
In Belekeri, Ankola, Uttara Kannada, Karnataka.
How big is it?
It has a stated cost of ₹4.1 crore and a site of 38.9 acres.
When was it filed?
The application was filed on 12 Feb 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 10 Apr 2026 |
| Application filed | 12 Feb 2026 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Ports & coast |
| Applicant | Additional Director of Fisheries, Fishing Harbours Malpe |
| Land area | 38.9 acres (15.7 ha) |
| Project cost | ₹4.1 crore |
| Village / locality | Belekeri |
| Taluk / tehsil | Ankola |
| District | Uttara Kannada |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-08613 |
In context
19 applications in Uttara Kannada since January 2022 are in the same category (Ports & coast): 9 approved, 5 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 38.9 acres, this one is smaller than 53% of them.
10 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Belekeri, Ankola, Uttara Kannada, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Request for Crz Clearance of Proposed Maintenance Dredging at Existing Fish… — coastal clearance granted, 0 m away
- Construction of Residential House by Varad Dinakar Naik — lapsed, 1.1 km away
- Construction of Residential House by Gopal Ramakrishna Nayhak — coastal clearance granted, 1.4 km away
- Diversion of 1.6576 Ha. & Rediversion of 1.1621 Ha. forest land (totally… — more information requested, 4.1 km away
- Request for Crz Clearance of Proposed Maintenance Dredging at Existing… — coastal clearance granted, 4.6 km away
- All-Weather Multi-Cargo Greenfield Deepwater Port near Ankola, Dist. Uttara… — returned to applicant, 4.8 km away
- Diversion of 1.465 Ha Forest land in F.Sy no 7,23&25 of Navagadda, 42A & 50A1A… — lapsed, 5 km away
- All-Weather Multi-Cargo Greenfield Deepwater Port near Ankola, Dist. Uttara… — under environmental review, 5 km away
More from Additional Director of Fisheries, Fishing Harbours Malpe in Uttara Kannada
- Request for Crz Clearance of Proposed Maintenance Dredging at Existing… — coastal clearance granted
- Request for Crz Clearance of Proposed Maintenance Dredging at Existing Tadri… — coastal clearance granted
- Request for Crz Clearance of Proposed Maintenance Dredging at Existing Fish… — coastal clearance granted
- CRZ NOC for Mentainance Dredging of Tadri Fishing Harbour in Kumta taluka of… — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.