Quick answers
What is this project?
Request for Crz Clearance of Proposed Maintenance Dredging at Existing Amadalli Fishing Harbour is an approved port and coastal project in Arga, Karwar, Uttara Kannada, Karnataka. The site covers 64.9 acres.
Who is building it?
The applicant is Additional Director of Fisheries, Fishing Harbours Malpe.
Has it been approved?
Yes. Its status is “Coastal clearance granted” (since 5 Oct 2026), as of 27 Nov 2026.
Where is it?
In Arga, Karwar, Uttara Kannada, Karnataka.
How big is it?
It has a stated cost of ₹5.6 crore and a site of 64.9 acres.
When was it filed?
The application was filed on 2 Jun 2026.
Project details
| Official title | Request for Crz Clearance of Proposed Maintenance Dredging at Existing Amadalli Fishing Harbour in Uttara Kannada District |
|---|---|
| Status | Coastal clearance granted |
| Status since | 5 Oct 2026 |
| Application filed | 2 Jun 2026 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Ports & coast |
| Applicant | Additional Director of Fisheries, Fishing Harbours Malpe |
| Land area | 64.9 acres (26.3 ha) |
| Project cost | ₹5.6 crore |
| Village / locality | Arga |
| Taluk / tehsil | Karwar |
| District | Uttara Kannada |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-08192 |
In context
19 applications in Uttara Kannada since January 2022 are in the same category (Ports & coast): 9 approved, 5 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 64.9 acres, this one is larger than 73% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Arga, Karwar, Uttara Kannada, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of forest land in Ankola and Karwar Taluks of Uttara Kannada… — lapsed, 2.1 km away
- Renewal of Water Tank to an Extent of 0.09 Ha — lapsed, 4.1 km away
- CRZ NOC for Mentainance Dredging at fish landing centres at Harwada and… — lapsed, 4.6 km away
- Request for Crz Clearance of Proposed Maintenance Dredging at Existing Fish… — coastal clearance granted, 4.6 km away
- Construction of Residential House by Varad Dinakar Naik — lapsed, 5.7 km away
- Construction of Residential House by Gopal Ramakrishna Nayhak — coastal clearance granted, 6 km away
- All-Weather Multi-Cargo Greenfield Deepwater Port near Ankola, Dist. Uttara… — returned to applicant, 6.4 km away
- Diversion of 1.6576 Ha. & Rediversion of 1.1621 Ha. forest land (totally… — more information requested, 8 km away
More from Additional Director of Fisheries, Fishing Harbours Malpe in Uttara Kannada
- Request for Crz Clearance of Proposed Maintenance Dredging at Existing Tadri… — coastal clearance granted
- Request for Crz Clearance of Proposed Maintenance Dredging at Existing Fish… — coastal clearance granted
- CRZ NOC for Mentainance Dredging of Tadri Fishing Harbour in Kumta taluka of… — lapsed
- CRZ NOC for Mentainance Dredging at fish landing centres at Harwada and… — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.