Project details
| Status | In-principle approval, conditions pending |
|---|---|
| Status since | 24 Sept 2026 |
| Application filed | 19 Jan 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | JSW Steel Limited |
| Land area | 116.6 acres (47.2 ha) |
| Forest land | 6.9 acres (2.8 ha) |
| Project cost | ₹125 crore |
| Village / locality | Bhujanganagar |
| Taluk / tehsil | Sandur |
| District | Ballari |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-07183 |
In context
12 applications in Ballari since January 2022 are in the same category (Buildings & townships): 4 approved, 4 filed or under review, and 4 withdrawn, lapsed or rejected. At 116.6 acres, this one is larger than 50% of them.
33 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bhujanganagar, Sandur, Ballari, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Re-Diversion of diverted forest land over an extent of 1.994 Ha w.r.t Pipe… — in-principle approval, conditions pending, 0 m away
- Re-diversion of forestland over an extent of 0.14 ha. area in favour of JSW… — lapsed, 0 m away
- Diversion of forestland over an extent of 1.123 ha. area for Pipe Conveyor… — lapsed, 200 m away
- Diversion of 0.956Ha forest land at Loading Plant Donimalai — lapsed, 900 m away
- Diversion of Existing Approach Road of Devadari Iron Ore Mine ML No. 006 (old… — under forest review, 2 km away
- Diversion of 0.893ha Forest Land and Re-Diversion of 0.627ha (Total 1.52 Ha)… — lapsed, 2.1 km away
- Diversion of 0.893ha Forest Land and Re-Diversion of 0.627ha (Total 1.52 Ha)… — lapsed, 2.1 km away
- SL No 12, Donimalai Range, Sandur,Ballari — more information requested, 2.7 km away
More from JSW Steel Limited in Ballari
- Amendment in Environment Clearance (EC) of M/s JSW Steel Limited &… — environmental approval granted
- Split / Transfer of Coke Oven 6 unit of capacity 1.5 MTPA — environmental approval granted
- EC for Setting up of 25 MTPA capacity (mineral throughput) Green-field High… — environmental approval granted
- EC for Setting up of 25 MTPA capacity (mineral throughput) Green-field High… — cleared for impact study
- Expansion / Modernization of Existing Jindal Vijayanagar Airport located at… — cleared for impact study
- Approval under section 2(1)(iii) of the Van (Sanrakshan Evam Samvardhan)… — lapsed
32 Jsw Steel projects in Ballari
All 97 Jsw Steel projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.