Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 30 Jan 2025 |
| Application filed | 28 Sept 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Airports |
| Applicant | JSW Steel Limited |
| Land area | 223 acres (90.3 ha) |
| Project cost | ₹380 crore |
| Village / locality | Toranagal |
| Taluk / tehsil | Sandur |
| District | Ballari |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-02554 |
In context
22 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Toranagal, Sandur, Ballari, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sanction of work "Torangallu to Ranjithpura Doubling (23km of South Western… — lapsed, 250 m away
- Vijayanagar Pump Storage Project — lapsed, 1.6 km away
- EC for Setting up of 25 MTPA capacity (mineral throughput) Green-field High… — environmental approval granted, 2.7 km away
- EC for Setting up of 25 MTPA capacity (mineral throughput) Green-field High… — cleared for impact study, 2.7 km away
- Split of existing EC of JSW Steel Ltd, Vijayanagar works of 18 MTPA Steel… — environmental approval granted, 3.5 km away
- Split of existing EC of JSW Steel Ltd, Vijayanagar works of 18 MTPA Steel… — withdrawn, 3.5 km away
- Split of existing EC of JSW Steel Ltd, Vijayanagar works of 18 MTPA Steel… — returned to applicant, 3.5 km away
- Environment Clearance for Change in Plant Configuration Without Increase in… — withdrawn, 3.6 km away
More from JSW Steel Limited in Ballari
- Amendment in Environment Clearance (EC) of M/s JSW Steel Limited &… — environmental approval granted
- Split / Transfer of Coke Oven 6 unit of capacity 1.5 MTPA — environmental approval granted
- EC for Setting up of 25 MTPA capacity (mineral throughput) Green-field High… — environmental approval granted
- Diversion of forestland over an extent of 2.781 ha area for pipe conveyor from… — in-principle approval, conditions pending
- EC for Setting up of 25 MTPA capacity (mineral throughput) Green-field High… — cleared for impact study
- Approval under section 2(1)(iii) of the Van (Sanrakshan Evam Samvardhan)… — lapsed
32 Jsw Steel projects in Ballari
All 97 Jsw Steel projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.