Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 7 May 2026 |
| Application filed | 19 Feb 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | JSW Steel Limited |
| Land area | 460.6 acres (186.4 ha) |
| Project cost | ₹3,250 crore |
| Village / locality | Taranagar |
| Taluk / tehsil | Sandur |
| District | Ballari |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-04622 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 19 Feb 2026 (this page) | Environmental approval granted | 460.6 acres | ₹3,250 crore |
| Early planning filed 19 Oct 2024 | Cleared for impact study | 460.6 acres | ₹3,250 crore |
In context
213 applications in Ballari since January 2022 are in the same category (Mining): 78 approved, 56 filed or under review, and 79 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 460.6 acres, this one is larger than 67% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Taranagar, Sandur, Ballari, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- EC for Setting up of 25 MTPA capacity (mineral throughput) Green-field High… — cleared for impact study, 0 m away
- Vijayanagar Pump Storage Project — lapsed, 1.4 km away
- Split of existing EC of JSW Steel Ltd, Vijayanagar works of 18 MTPA Steel… — environmental approval granted, 1.6 km away
- Split of existing EC of JSW Steel Ltd, Vijayanagar works of 18 MTPA Steel… — withdrawn, 1.6 km away
- Split of existing EC of JSW Steel Ltd, Vijayanagar works of 18 MTPA Steel… — returned to applicant, 1.6 km away
- Environment Clearance for Change in Plant Configuration Without Increase in… — withdrawn, 1.7 km away
- Change in plant configuration without increase in steel production capacity of… — withdrawn, 1.7 km away
- Environment Clearance for Change in Plant Configuration Without Increase in… — withdrawn, 1.7 km away
More from JSW Steel Limited in Ballari
- Amendment in Environment Clearance (EC) of M/s JSW Steel Limited &… — environmental approval granted
- Split / Transfer of Coke Oven 6 unit of capacity 1.5 MTPA — environmental approval granted
- Diversion of forestland over an extent of 2.781 ha area for pipe conveyor from… — in-principle approval, conditions pending
- Expansion / Modernization of Existing Jindal Vijayanagar Airport located at… — cleared for impact study
- Approval under section 2(1)(iii) of the Van (Sanrakshan Evam Samvardhan)… — lapsed
- Increase in production capacity from 0.94 MMTPA to 1.382 MMTPA of Rama Iron… — environmental approval granted
32 Jsw Steel projects in Ballari
All 97 Jsw Steel projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.