Quick answers
What is this project?
Proposed Approach road in Forest Survey Number 560 to Revenue survey number 612 is a lapsed building project in Mudageri, Karwar, Uttara Kannada, Karnataka. The site covers 4.2 acres.
Who is building it?
The applicant is Michael Alvares.
Has it been approved?
No. The application was lapsed on 16 Nov 2024, so it is no longer under consideration.
Where is it?
In Mudageri, Karwar, Uttara Kannada, Karnataka.
How big is it?
It has a stated cost of ₹750 crore; a site of 4.2 acres and 660 m² of forest land.
When was it filed?
The application was filed on 18 Sept 2024.
Project details
| Official title | Construction of proposed Approach road in Forest Survey Number 560 to Revenue survey number 612 in Mudageri Village, Karwar taluk , Uttara Kannada district in favour of Golden Harvest Organic Farm(R), Karwar. |
|---|---|
| Status | Lapsed |
| Status since | 16 Nov 2024 |
| Application filed | 18 Sept 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Michael Alvares |
| Land area | 4.2 acres (1.7 ha) |
| Forest land | 660 m² |
| Project cost | ₹750 crore |
| Village / locality | Mudageri |
| Taluk / tehsil | Karwar |
| District | Uttara Kannada |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-07672 |
In context
93 applications in Uttara Kannada since January 2022 are in the same category (Buildings & townships): 6 approved, 27 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 4.2 acres, this one is larger than 73% of them.
Where it is
Mudageri, Karwar, Uttara Kannada, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion Of 0.02 Ha Of Forest Land Of Maigini Village (Karwar Taluk) for… — lapsed, 6.1 km away
- Bsnl 4g Saturation Project Maigini With Ofc Route — forest land use approved, 6.2 km away
- OPTICAL FIBER CABLE LAYING BY BHARATH SANCHAR NIGAM LTD FOR CONNECTIVITY TO 4G… — lapsed, 6.6 km away
- Laying of Ofc Cable Under 4g Saturation Project for 4g Bts in Maigini With… — forest land use approved, 6.7 km away
- Optical Fiber Cable Laying Under 4g Satuaration Project for Maigini Site — lapsed, 6.7 km away
- Eco-Tourism — lapsed, 7.3 km away
- Waterways on the Kali river (NW-52) — lapsed, 7.6 km away
- Providing Ugd System for Treating Nullah Sewage at Karwar Town on Short Term… — lapsed, 8.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.