What is this project?
Diversion Of 0.02 Ha Of Forest Land Of Maigini Village (Karwar Taluk) for Setting up Mobile tower and related infrastructure under 4G Saturation Project is a lapsed building project in Maingini, Karwar, Uttara Kannada, Karnataka. The site covers 0 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
No. The application was lapsed on 18 Jul 2023, so it is no longer under consideration.
Where is it?
In Maingini, Karwar, Uttara Kannada, Karnataka.
How big is it?
It has a stated cost of ₹50 lakh; a site of 0 acres and 200 m² of forest land.
When was it filed?
The application was filed on 9 Dec 2022.
Project details
| Status | Lapsed |
|---|---|
| Status since | 18 Jul 2023 |
| Application filed | 9 Dec 2022 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Mahesh Nair |
| Land area | 200 m² |
| Forest land | 200 m² |
| Project cost | ₹50 lakh |
| Village / locality | Maingini |
| Taluk / tehsil | Karwar |
| District | Uttara Kannada |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-06113 |
In context
93 applications in Uttara Kannada since January 2022 are in the same category (Buildings & townships): 6 approved, 27 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0 acres, this one is smaller than 99% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Maingini, Karwar, Uttara Kannada, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bsnl 4g Saturation Project Maigini With Ofc Route — forest land use approved, 0 m away
- OPTICAL FIBER CABLE LAYING BY BHARATH SANCHAR NIGAM LTD FOR CONNECTIVITY TO 4G… — lapsed, 750 m away
- Laying of Ofc Cable Under 4g Saturation Project for 4g Bts in Maigini With… — forest land use approved, 800 m away
- Optical Fiber Cable Laying Under 4g Satuaration Project for Maigini Site — lapsed, 800 m away
- Proposed Approach road in Forest Survey Number 560 to Revenue survey number 612 — lapsed, 6.1 km away
- "Sand Bar-04" in the Kali River — lapsed, 7 km away
- "Sand Bar-KL-04" (SB-KL-04) — lapsed, 7 km away
- "Sand Bar -03" in the Kali River — lapsed, 7.1 km away
More from Mahesh Nair in Uttara Kannada
- Bsnl 4g Saturation Project Underground Optical Fiber Laying for Kanur,… — initial checks
- Optical Fiber Cable Laying Under 4g Satuaration Project for Achave Kuntakani… — under wildlife review
- Bsnl Usof 4g Saturation Project — under forest review
- Bsnl 4g Saturation Project Ofc Route Veeranjol, Palada, Vatla Form E — under forest review
- Optical Fiber Cable Laying by Bharath Sanchar Nigam LTD for Connectivity to 4g… — more information requested
- Bsnl 4g Saturation Tower Project Ofc Route Aveda Popalwadi — under forest review
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.