Quick answers
What is this project?
Augmentation To Combined Multi Village Water Supply Scheme to Gotegali & Other 42 Habitations And Kerwadi & Other 41 Habitations is a proposed building project in Goyar, Karwar, Uttara Kannada, Karnataka. The site covers 2.1 acres.
Who is building it?
The applicant is Department of Irrigation.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Goyar, Karwar, Uttara Kannada, Karnataka.
How big is it?
It has a stated cost of ₹2.3 crore and a site of 2.1 acres.
When was it filed?
The application was filed on 7 Aug 2024.
Project details
| Official title | Augmentation To Combined Multi Village Water Supply Scheme to Gotegali & Other 42 Habitations And Kerwadi & Other 41 Habitations in Karwar Taluk Of Uttara Kannada District, Karnataka through Design, Build, Operate And Transfer (DBOT) Mode Under Jal Jeevan Mission |
|---|---|
| Status | More information requested |
| Status since | 7 Aug 2024 |
| Application filed | 7 Aug 2024 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Department of Irrigation |
| Land area | 2.1 acres (0.9 ha) |
| Project cost | ₹2.3 crore |
| Village / locality | Goyar |
| Taluk / tehsil | Karwar |
| District | Uttara Kannada |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-07950 |
In context
93 applications in Uttara Kannada since January 2022 are in the same category (Buildings & townships): 6 approved, 27 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 2.1 acres, this one is larger than 62% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Goyar, Karwar, Uttara Kannada, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Laying of Ofc Cable Under 4g Saturation Project for 4g Bts in Goyar,karwar… — lapsed, 1.9 km away
- Bsnl Usof 4g Saturation Project at Goyar - Ofc Route Is Proposed for… — lapsed, 2.3 km away
- Optical Fiber Cable Laying by Bharat Sanchar Nigam LTD for Connectivity to 4g… — lapsed, 2.3 km away
- Kalinadi Hydro Electric Project Stage - II Kadra - denotification of Kadra RH… — initial checks, 4 km away
- Main Rural Links (MRL)-16 SH-34 To Kudegalli Via Baragadde — more information requested, 4.2 km away
- "Sand Bar -07" in the Kali River — lapsed, 6.1 km away
- "Sand Bar-KL-O7" (SB-KL-O7) — lapsed, 6.1 km away
- Optical Fiber Cable Laying by Bharat Sanchar Nigam LTD for Connectivity to 4g… — forest land use approved, 6.1 km away
More from Department of Irrigation in Uttara Kannada
- Providing FHTCs to 227 Households in Bavuru & other 13 Habitation of Saralagi… — initial checks
- Proposed Multi Village Drinking Water Supply Facilities to Shirali and other… — under forest review
- Multi Village Scheme to Karki and Other 19 Villages — under wildlife review
- Proposed Multi Village Drinking Water Supply Facilities to Shirali and other… — lapsed
- Providing FHTC's to 1330 Households in Ajjodlu & other 27 Habitation of Kharwa… — under forest review
- Providing FHTC's to 739 Households in Herangadi & other 16 Habitation of… — more information requested
51 Department of Irrigation, Karnataka projects in Uttara Kannada
All 61 Department of Irrigation, Karnataka projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.