Quick answers
What is this project?
Bsnl Usof 4g Saturation Project at Goyar - Ofc Route Is Proposed for Connectivity is a lapsed telecom project in Goyar, Karwar, Uttara Kannada, Karnataka. The site covers 1.2 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
No. The application was lapsed on 7 May 2024, so it is no longer under consideration.
Where is it?
In Goyar, Karwar, Uttara Kannada, Karnataka.
How big is it?
It has a stated cost of ₹95 lakh; a site of 1.2 acres and 1 acres (0.4 ha) of forest land.
When was it filed?
The application was filed on 14 Nov 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 7 May 2024 |
| Application filed | 14 Nov 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Land area | 1.2 acres (0.5 ha) |
| Forest land | 1 acres (0.4 ha) |
| Project cost | ₹95 lakh |
| Village / locality | Goyar |
| Taluk / tehsil | Karwar |
| District | Uttara Kannada |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-06897 |
In context
529 applications in Uttara Kannada since January 2022 are in the same category (Telecom): 181 approved, 43 filed or under review, and 277 withdrawn, lapsed or rejected. The approved ones took a median of 11 months from filing to approval. At 1.2 acres, this one is larger than 93% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Goyar, Karwar, Uttara Kannada, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Optical Fiber Cable Laying by Bharat Sanchar Nigam LTD for Connectivity to 4g… — lapsed, 100 m away
- Laying of Ofc Cable Under 4g Saturation Project for 4g Bts in Goyar,karwar… — lapsed, 800 m away
- Main Rural Links (MRL)-16 SH-34 To Kudegalli Via Baragadde — more information requested, 2.3 km away
- Augmentation To Combined Multi Village Water Supply Scheme to Gotegali & Other… — more information requested, 2.3 km away
- "Sand Bar -07" in the Kali River — lapsed, 5.3 km away
- "Sand Bar-KL-O7" (SB-KL-O7) — lapsed, 5.3 km away
- "Sand Bar -06" in the Kali River Bed of The Senior Geologist & Implementation… — lapsed, 5.9 km away
- "Sand Bar-KL-06" (SB-KL-06) — lapsed, 5.9 km away
More from Mahesh Nair in Uttara Kannada
- Bsnl 4g Saturation Project Underground Optical Fiber Laying for Kanur,… — initial checks
- Optical Fiber Cable Laying Under 4g Satuaration Project for Achave Kuntakani… — under wildlife review
- Bsnl Usof 4g Saturation Project — under forest review
- Bsnl 4g Saturation Project Ofc Route Veeranjol, Palada, Vatla Form E — under forest review
- Optical Fiber Cable Laying by Bharath Sanchar Nigam LTD for Connectivity to 4g… — more information requested
- Bsnl 4g Saturation Tower Project Ofc Route Aveda Popalwadi — under forest review
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.