Quick answers
What is this project?
Request for Crz Clearance of Proposed Maintenance Dredging at Existing Tadri Fishing Harbour is an approved port and coastal project in Ganehalli, Kumta, Uttara Kannada, Karnataka. The site covers 40.9 acres.
Who is building it?
The applicant is Additional Director of Fisheries, Fishing Harbours Malpe.
Has it been approved?
Yes. Its status is “Coastal clearance granted” (since 5 Oct 2026), as of 27 Nov 2026.
Where is it?
In Ganehalli, Kumta, Uttara Kannada, Karnataka.
How big is it?
It has a stated cost of ₹2.7 crore and a site of 40.9 acres.
When was it filed?
The application was filed on 2 Jun 2026.
Project details
| Official title | Request for Crz Clearance of Proposed Maintenance Dredging at Existing Tadri Fishing Harbour in Uttara Kannada District |
|---|---|
| Status | Coastal clearance granted |
| Status since | 5 Oct 2026 |
| Application filed | 2 Jun 2026 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Ports & coast |
| Applicant | Additional Director of Fisheries, Fishing Harbours Malpe |
| Land area | 40.9 acres (16.6 ha) |
| Project cost | ₹2.7 crore |
| Village / locality | Ganehalli |
| Taluk / tehsil | Kumta |
| District | Uttara Kannada |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-08437 |
In context
19 applications in Uttara Kannada since January 2022 are in the same category (Ports & coast): 9 approved, 5 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 40.9 acres, this one is larger than 53% of them.
11 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ganehalli, Kumta, Uttara Kannada, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- CRZ NOC for Mentainance Dredging of Tadri Fishing Harbour in Kumta taluka of… — lapsed, 0 m away
- Tadadi-Aghanashini ferry Line, in Kumta Taluka of Uttara Kannada District,… — coastal clearance granted, 1.6 km away
- Diversion of 0.40 ha of Forest Land in Sy. No. 1040 of Gokarna Village for… — more information requested, 1.6 km away
- Construction of Ice Plant at Tadri in Kumta Taluka — lapsed, 1.6 km away
- Residential house by Malini Janardhan Patagar — coastal clearance granted, 3 km away
- For construction of Approach Road to Patta Land passing — lapsed, 3.2 km away
- CRZ Clearance for Diversion of 0.516Ha for Improvement of Road — lapsed, 3.6 km away
- Diversion of forest land — lapsed, 4 km away
More from Additional Director of Fisheries, Fishing Harbours Malpe in Uttara Kannada
- Request for Crz Clearance of Proposed Maintenance Dredging at Existing… — coastal clearance granted
- Request for Crz Clearance of Proposed Maintenance Dredging at Existing Fish… — coastal clearance granted
- CRZ NOC for Mentainance Dredging of Tadri Fishing Harbour in Kumta taluka of… — lapsed
- CRZ NOC for Mentainance Dredging at fish landing centres at Harwada and… — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.