Quick answers
What is this project?
Proposed 125MLD Water Treatment Plant on upstream of Harekala vented Dam at S.No. 57 is an approved water and irrigation project in Adyar, Mangaluru, Dakshina Kannada, Karnataka. The site covers 5.2 acres.
Who is building it?
The applicant is Suresh Arehole halappa.
Has it been approved?
Yes. Its status is “Coastal clearance granted” (since 12 Feb 2025), as of 27 Nov 2026.
Where is it?
In Adyar, Mangaluru, Dakshina Kannada, Karnataka.
How big is it?
It has a stated cost of ₹127.7 crore and a site of 5.2 acres.
When was it filed?
The application was filed on 27 Sept 2024.
Project details
| Status | Coastal clearance granted |
|---|---|
| Status since | 12 Feb 2025 |
| Application filed | 27 Sept 2024 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Suresh Arehole halappa |
| Land area | 5.2 acres (2.1 ha) |
| Project cost | ₹127.7 crore |
| Village / locality | Adyar |
| Taluk / tehsil | Mangaluru |
| District | Dakshina Kannada |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-08660 |
In context
5 applications in Dakshina Kannada since January 2022 are in the same category (Water & irrigation): 1 approved, 3 filed or under review, and 1 withdrawn, lapsed or rejected.
11 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Adyar, Mangaluru, Dakshina Kannada, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sahyadri College of Engineering and Management — lapsed, 450 m away
- Kharland to Left Bank of Nethravathi River Near Harekala Kadavu — coastal clearance granted, 1.3 km away
- Kharland to Left Bank of Nethravathi River Near Harekala Kadavu — lapsed, 1.3 km away
- River Bank Protection Work at Dota — under coastal review, 2.2 km away
- Residential Tower with Neighbourhood Shops and MLCP - "Rohan Heaven" — environmental approval granted, 3.2 km away
- River bank protection work to Nethravathi River at Gattikudru — lapsed, 3.6 km away
- Building Stone Quarry (QL No. DKD-381) "Sri Jugul Paul Saldanha" — environmental approval granted, 3.7 km away
- Building Stone Quarry(QL No. DKD 384) "Sri. Bharathraj Shetty" — lapsed, 3.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.