Quick answers
What is River Bank Protection Work at Dota?
River Bank Protection Work at Dota is a proposed building project in Pavuru, Ullala, Dakshina Kannada, Karnataka. The site covers 8.6 acres.
Who is building it?
The applicant is Executive Engineer Minor Irrigation Department.
Has it been approved?
Not yet. The application is still under review: its status is “Under coastal review”, as of 27 Nov 2026.
Where is it?
In Pavuru, Ullala, Dakshina Kannada, Karnataka.
How big is it?
It has a stated cost of ₹40 crore and a site of 8.6 acres.
When was it filed?
The application was filed on 16 Oct 2026.
Project details
| Official title | River Bank Protection Work at Dota in Pavooru Village to Jalakada Katte of Boliyar Village in Ullala Taluk of Dakshina Kannada District |
|---|---|
| Status | Under coastal review |
| Status since | 16 Oct 2026 |
| Application filed | 16 Oct 2026 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Executive Engineer Minor Irrigation Department |
| Land area | 8.6 acres (3.5 ha) |
| Project cost | ₹40 crore |
| Village / locality | Pavuru |
| Taluk / tehsil | Ullala |
| District | Dakshina Kannada |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-08331 |
In context
236 applications in Dakshina Kannada since January 2022 are in the same category (Buildings & townships): 110 approved, 39 filed or under review, and 85 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 8.6 acres, this one is larger than 85% of them.
9 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Pavuru, Ullala, Dakshina Kannada, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sahyadri College of Engineering and Management — lapsed, 1.8 km away
- Proposed 125MLD Water Treatment Plant on upstream of Harekala vented Dam at… — coastal clearance granted, 2.2 km away
- Laterite Stone (Grade-A) Quarry (QL No. 404) "Smt. Helen Cresta" — environmental approval granted, 2.9 km away
- Building Stone Quarry(QL No. DKD 384) "Sri. Bharathraj Shetty" — lapsed, 3.1 km away
- Kharland to Left Bank of Nethravathi River Near Harekala Kadavu — coastal clearance granted, 3.2 km away
- Kharland to Left Bank of Nethravathi River Near Harekala Kadavu — lapsed, 3.2 km away
- Building Stone Quarry (QL No. DSKNS 414) "M/s. B R INDUSTRIES" — environmental approval granted, 3.3 km away
- Building Stone Quarry Smt. Rekha Mohan — environmental approval granted, 3.3 km away
More from Executive Engineer Minor Irrigation Department in Dakshina Kannada
- A. Project Name Construction of River Bank Protection Work at Margathale — lapsed
- River bank protection work to Nethravathi River at Gattikudru — lapsed
- River Bank Protection Work at Uliya- Gurikara — lapsed
- Kharland at Karithota — lapsed
- Kharland to Nethravathi River From Kannuru to Bajal — coastal clearance granted
- Kharland to Left Bank of Nethravathi River Near Harekala Kadavu — coastal clearance granted
All 14 Executive Engineer Minor Irrigation Department, Karnataka projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.