Quick answers
What is this project?
Kharland to Left Bank of Nethravathi River Near Harekala Kadavu is a lapsed building project in Harekala (Ct), Ullala, Dakshina Kannada, Karnataka.
Who is building it?
The applicant is Executive Engineer Minor Irrigation Department.
Has it been approved?
No. The application was lapsed on 29 Oct 2024, so it is no longer under consideration.
Where is it?
In Harekala (Ct), Ullala, Dakshina Kannada, Karnataka.
How big is it?
It has a stated cost of ₹6 crore.
When was it filed?
The application was filed on 1 Mar 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Kharland to Left Bank of Nethravathi River Near Harekala Kadavu
Project details
| Official title | Construction of Kharland to Left Bank of Nethravathi River Near Harekala Kadavu in Harekala Village of Ullala Taluk in Dakshina Kannada District. |
|---|---|
| Status | Lapsed |
| Status since | 29 Oct 2024 |
| Application filed | 1 Mar 2024 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Executive Engineer Minor Irrigation Department |
| Project cost | ₹6 crore |
| Village / locality | Harekala (Ct) |
| Taluk / tehsil | Ullala |
| District | Dakshina Kannada |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-08632 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 28 Nov 2024 | Coastal clearance granted | ₹6 crore | |
| New project filed 1 Mar 2024 (this page) | Lapsed | ₹6 crore |
In context
236 applications in Dakshina Kannada since January 2022 are in the same category (Buildings & townships): 110 approved, 39 filed or under review, and 85 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval.
12 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Harekala (Ct), Ullala, Dakshina Kannada, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Kharland to Left Bank of Nethravathi River Near Harekala Kadavu — coastal clearance granted, 0 m away
- Proposed 125MLD Water Treatment Plant on upstream of Harekala vented Dam at… — coastal clearance granted, 1.3 km away
- Sahyadri College of Engineering and Management — lapsed, 1.7 km away
- River bank protection work to Nethravathi River at Gattikudru — lapsed, 2.3 km away
- Residential Tower with Neighbourhood Shops and MLCP - "Rohan Heaven" — environmental approval granted, 2.6 km away
- River Bank Protection Work at Dota — under coastal review, 3.2 km away
- Residential Apartment Building - "Rohan Tower" — environmental approval granted, 3.6 km away
- Building Stone Quarry(QL No. DKD 384) "Sri. Bharathraj Shetty" — lapsed, 3.9 km away
More from Executive Engineer Minor Irrigation Department in Dakshina Kannada
- River Bank Protection Work at Dota — under coastal review
- A. Project Name Construction of River Bank Protection Work at Margathale — lapsed
- River bank protection work to Nethravathi River at Gattikudru — lapsed
- River Bank Protection Work at Uliya- Gurikara — lapsed
- Kharland at Karithota — lapsed
- Kharland to Nethravathi River From Kannuru to Bajal — coastal clearance granted
All 14 Executive Engineer Minor Irrigation Department, Karnataka projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.