Project details
| Status | Under forest review |
|---|---|
| Status since | 16 Nov 2026 |
| Application filed | 16 Nov 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Mining |
| Applicant | Nmdc Limited |
| Land area | 59.6 acres (24.1 ha) |
| Forest land | 17.3 acres (7 ha) |
| Village / locality | Devagiri |
| Taluk / tehsil | Sandur |
| District | Ballari |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-08839 |
In context
213 applications in Ballari since January 2022 are in the same category (Mining): 78 approved, 56 filed or under review, and 79 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 59.6 acres, this one is smaller than 58% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 2,091.2 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 20 mining leases have applied within 5 km.
Where it is
Devagiri, Sandur, Ballari, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Re-diversion of 7.00 Hectare Forest land (3.33 Hectare inside SMIORE Mining… — initial checks, 0 m away
- Exploration in additional area (un-diverted) of Kumaraswamy Iron Mine Lease… — lapsed, 250 m away
- Renewal of 16.50ha already Diverted Forest Land For Ancillary Facilities… — lapsed, 500 m away
- Diversion of 1.58ha Forest Land Area for Shifting of Existing Zp Road Passing… — lapsed, 500 m away
- Environmental Clearance for Iron Ore and Manganese Ore Mine (Ml No: 2678) of… — environmental approval granted, 550 m away
- Increase of Iron Ore production from 1.60 to 4.50 MTPA retaining the Manganese… — environmental approval granted, 950 m away
- Diversion of 1.63ha Forest Land for Shifting of Existing Zilla Panchayat Road… — lapsed, 1.3 km away
- Diversion of 4.035 Ha of Forest land for New approach road in connection with… — lapsed, 2.2 km away
More from Nmdc Limited in Ballari
- Re-diversion of 7.00 Hectare Forest land (3.33 Hectare inside SMIORE Mining… — initial checks
- Diversion of 4.68 Ha Forest Land for Existing Water Pipe Line From Water… — lapsed
- Exploration in additional area (un-diverted) of Kumaraswamy Iron Mine Lease… — lapsed
- Diversion of 0.956Ha forest land at Loading Plant Donimalai — lapsed
- Amendment to Environmental Clearance of Donimalai Iron Ore Mine of NMDC… — returned to applicant
- Proposed Residential Towers Project by NMDC Limited in existing Donimalai… — environmental approval granted
9 Nmdc projects in Ballari
All 40 Nmdc projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.