Project details
| Status | Lapsed |
|---|---|
| Status since | 10 Jun 2026 |
| Application filed | 22 Nov 2022 |
| Approval sought | Forest land use |
| Application type | Renewal |
| Sector | Mining |
| Applicant | Nmdc Limited Donimalai |
| Land area | 40.8 acres (16.5 ha) |
| Forest land | 40.8 acres (16.5 ha) |
| Project cost | ₹898.6 crore |
| Village / locality | Doni Malai |
| Taluk / tehsil | Sandur |
| District | Ballari |
| State | Karnataka |
| Location from | Site area on record |
| Our reference | WID-KA-06867 |
In context
213 applications in Ballari since January 2022 are in the same category (Mining): 78 approved, 56 filed or under review, and 79 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 40.8 acres, this one is smaller than 62% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 2,072.4 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 22 mining leases have applied within 5 km.
Where it is
Doni Malai, Sandur, Ballari, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 1.58ha Forest Land Area for Shifting of Existing Zp Road Passing… — lapsed, 100 m away
- Exploration in additional area (un-diverted) of Kumaraswamy Iron Mine Lease… — lapsed, 300 m away
- DIversion of forest land (7Ha) for dispatch routes of Kumaraswamy Iron Ore… — under forest review, 500 m away
- Re-diversion of 7.00 Hectare Forest land (3.33 Hectare inside SMIORE Mining… — initial checks, 500 m away
- Diversion of 1.63ha Forest Land for Shifting of Existing Zilla Panchayat Road… — lapsed, 800 m away
- Environmental Clearance for Iron Ore and Manganese Ore Mine (Ml No: 2678) of… — environmental approval granted, 850 m away
- Increase of Iron Ore production from 1.60 to 4.50 MTPA retaining the Manganese… — environmental approval granted, 1.3 km away
- Diversion of 3.862 Ha for Road Purpose of Forest land in Connection with… — lapsed, 2.3 km away
More from Nmdc Limited Donimalai in Ballari
- Diversion of 0.893ha Forest Land and Re-Diversion of 0.627ha (Total 1.52ha)… — under forest review
- Exploration at proposed Additional Area (281 Ha) adjacent to Donimalai Iron… — forest land use approved
- Diversion of 0.893ha Forest Land and Re-Diversion of 0.627ha (Total 1.52ha)… — under forest review
- Diversion of 0.266Ha Forest Land for transportation of waste material from… — lapsed
- Diversion of 1.63ha Forest Land for Shifting of Existing Zilla Panchayat Road… — lapsed
- Diversion of 0.893ha Forest Land and Re-Diversion of 0.627ha (Total 1.52 Ha)… — lapsed
All 8 Nmdc Limited Donimalai projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.