What is Developing? Open the mapMap

LapsedPower · Ballari, Karnataka

Diversion of 4.68 Ha Forest Land for Existing Water Pipe Line From Water Treatment Plant to Narihalla Dam and 11KV Power Line From Donimalai Iron Ore Mine to Narihalla Dam

Diversion of 4.68 Ha Forest Land for Existing Water Pipe Line From Water Treatment Plant to Narihalla Dam and 11KV Power Line From Donimalai Iron Ore Mine to Narihalla Dam is a lapsed power project in Nauluti, Sandur, Ballari, Karnataka. The site covers 19,923 acres. Its stated project cost is ₹2 crore. As of 27 Nov 2026, its status is “Lapsed” (since 1 Sept 2026).

See it on the live map All projects in Ballari

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusLapsed
Status since1 Sept 2026
Application filed5 Apr 2026
Approval soughtForest land use
Application typeNew project
SectorPower
ApplicantNmdc Limited
Land area19,923 acres (8,062.6 ha)
Forest land11.6 acres (4.7 ha)
Project cost₹2 crore
Village / localityNauluti
Taluk / tehsilSandur
DistrictBallari
StateKarnataka
Location fromSite boundary on record
Our referenceWID-KA-07493

In context

9 applications in Ballari since January 2022 are in the same category (Power): 1 approved, 5 filed or under review, and 3 withdrawn, lapsed or rejected.

36 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Nauluti, Sandur, Ballari, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Nmdc Limited in Ballari

9 Nmdc projects in Ballari
All 40 Nmdc projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.