Quick answers
What is 4G Saturation Project at Kalkkund Malappuram District?
4G Saturation Project at Kalkkund Malappuram District is an approved telecom project in Karuvarakundu, Nilambur, Malappuram, Kerala. The site covers 0.1 acres.
Who is building it?
The applicant is Bharat Sanchar Nigam Limited.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 9 Nov 2023), as of 27 Nov 2026.
Where is it?
In Karuvarakundu, Nilambur, Malappuram, Kerala.
How big is it?
It has a stated cost of ₹2 crore; a site of 0.1 acres and 280 m² of forest land.
When was it filed?
The application was filed on 20 Jul 2023.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 9 Nov 2023 |
| Application filed | 20 Jul 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Bharat Sanchar Nigam Limited |
| Land area | 300 m² |
| Forest land | 280 m² |
| Project cost | ₹2 crore |
| Village / locality | Karuvarakundu |
| Taluk / tehsil | Nilambur |
| District | Malappuram |
| State | Kerala |
| Location from | Site boundary on record |
| Our reference | WID-KL-01903 |
In context
8 applications in Malappuram since January 2022 are in the same category (Telecom): 1 approved, 2 filed or under review, and 5 withdrawn, lapsed or rejected.
Where it is
Karuvarakundu, Nilambur, Malappuram, Kerala. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Granite Building Stone Quarry of Ayoob Khan (Re-Appraisal of Deiaa Ec No.… — not approved, 7.6 km away
- 4/6 Lanning of Palakkad - Kozhikode of NH-966(Greenfield) from Km.0.000 to… — under wildlife review, 11.8 km away
- Ummer — environmental approval granted, 12.2 km away
- Granite Building Stone Quarry of Josekutty — more information requested, 14.5 km away
- GRANITE BUILDING STONE QUARRY OF Mr. JOSE KUTTY (EC TRANSFER FROM DEIAA TO… — withdrawn, 14.5 km away
- Granite Building Stone Quarry of Mr Thouseef Jamal U — under environmental review, 15.5 km away
- Laterite Building Stone Quarry of Sri. Mohammed Asraf Mecheeri — under environmental review, 16.7 km away
- USOF 4G Saturation Project of Category-2 sites(Vattikkallu Tribal Colony,… — lapsed, 16.8 km away
More from Bharat Sanchar Nigam Limited in Malappuram
- USOF Backhaul Connectivity Site at Ambuttanpotti Malappuram BA — lapsed
- USOF 4G Saturation Project of Category-2 sites(Vattikkallu Tribal Colony,… — lapsed
- 4G Saturation Project - MalappuramDistrict — more information requested
4 Bharat Sanchar Nigam (BSNL) projects in Malappuram
All 1,001 Bharat Sanchar Nigam (BSNL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.