Quick answers
What is Attle-Ii Small Hydroelectric Project (6 MW)?
Attle-Ii Small Hydroelectric Project (6 MW) is a lapsed water and irrigation project in Palakkayam, Mannarkad, Palakkad, Kerala. The site covers 9.1 acres.
Who is building it?
The applicant is Darshan Renewable Energies Private Limited.
Has it been approved?
No. The application was lapsed on 1 Sept 2023, so it is no longer under consideration.
Where is it?
In Palakkayam, Mannarkad, Palakkad, Kerala.
How big is it?
It has a stated cost of ₹55 crore; a site of 9.1 acres and 3,530 m² of forest land.
When was it filed?
The application was filed on 3 Apr 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 1 Sept 2023 |
| Application filed | 3 Apr 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Darshan Renewable Energies Private Limited |
| Land area | 9.1 acres (3.7 ha) |
| Forest land | 3,530 m² |
| Project cost | ₹55 crore |
| Village / locality | Palakkayam |
| Taluk / tehsil | Mannarkad |
| District | Palakkad |
| State | Kerala |
| Location from | Site area on record |
| Our reference | WID-KL-01833 |
In context
64 applications in Palakkad since January 2022 are in the same category (Water & irrigation): 44 approved, 8 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 9.1 acres, this one is larger than 93% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Palakkayam, Mannarkad, Palakkad, Kerala. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Attle-Ii Small Hydroelectric Project (4 MW) — not approved, 300 m away
- Attle-I Small Hydroelectric Project (5 MW) — not approved, 1.6 km away
- Attle-I Small Hydroelectric Project (6 MW) — lapsed, 1.9 km away
- Laterite Building Stone Quarry of Mr. Babu K. P — under environmental review, 5.9 km away
- Providing 4G/5G coverage toUncovered Villages- Palakkad BA — in-principle approval, conditions pending, 7.7 km away
- Providing 4G/5G coverage toUncovered Villages- Palakkad BA — application filed, 7.7 km away
- Laterite Building Stone Quarry of Mr. Unnikrishnan — environmental approval granted, 8.7 km away
- Siruvani Drinking Water Supply Scheme — lapsed, 8.7 km away
More from Darshan Renewable Energies Private Limited in Palakkad
- Attle-Ii Small Hydroelectric Project (4 MW) — not approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.