Quick answers
What is Laying of OFC from Moozhiyaar to Kakki?
Laying of OFC from Moozhiyaar to Kakki is a lapsed telecom project in Seethathodu, Konni, Pathanamthitta, Kerala. It seeks 2.8 acres of forest land.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
No. The application was lapsed on 2 Jan 2024, so it is no longer under consideration.
Where is it?
In Seethathodu, Konni, Pathanamthitta, Kerala.
How big is it?
It has a stated cost of ₹7 crore and 2.8 acres (1.2 ha) of forest land.
When was it filed?
The application was filed on 26 Sept 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 2 Jan 2024 |
| Application filed | 26 Sept 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Forest land | 2.8 acres (1.2 ha) |
| Project cost | ₹7 crore |
| Village / locality | Seethathodu |
| Taluk / tehsil | Konni |
| District | Pathanamthitta |
| State | Kerala |
| Location from | Site boundary on record |
| Our reference | WID-KL-02215 |
In context
12 applications in Pathanamthitta since January 2022 are in the same category (Telecom): 4 approved, 5 filed or under review, and 3 withdrawn, lapsed or rejected.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Seethathodu, Konni, Pathanamthitta, Kerala. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Usof Saturation Project -Kakki Stn Pathanamthitta — forest land use approved, 2.1 km away
- Sabarimala communication- Moozhiyar — application filed, 3.8 km away
- Sabarimala communication- Moozhiyar — more information requested, 3.8 km away
- Usof Saturation Project -Moozhiyaar Pathanamthitta — lapsed, 6.8 km away
- Replacement of OFC from Chalakayam to Sabarimala — forest land use approved, 11.1 km away
- Construction of New Police Station at Pampa — under wildlife review, 11.6 km away
- Pamba Bus Station — lapsed, 11.7 km away
- Sabarimala Ropeway Project — decision issued, 12.5 km away
More from Mahesh Nair in Pathanamthitta
- Laying OFC from Maneera to Kokkathode BTS — initial checks
- MAST ( small tower ) of 15 mtrs on Roof Top of Elavumkal Forest Check Post — more information requested
- Replacement of OFC from Chalakayam to Sabarimala — forest land use approved
- 4g Saturation Project for Uncoverd Villages of Pathnamthitta — in-principle approval, conditions pending
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.