Quick answers
What is this project?
MAST ( small tower ) of 15 mtrs on Roof Top of Elavumkal Forest Check Post is a proposed telecom project in Perunadu, Ranni, Pathanamthitta, Kerala. It seeks 0 acres of forest land.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Perunadu, Ranni, Pathanamthitta, Kerala.
How big is it?
It has a stated cost of ₹1 lakh and 10 m² of forest land.
When was it filed?
The application was filed on 17 Jul 2026.
Project details
| Official title | Construction of MAST ( small tower ) of 15 mtrs on Roof Top of Elavumkal Forest Check Post |
|---|---|
| Status | More information requested |
| Status since | 28 Sept 2026 |
| Application filed | 17 Jul 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Forest land | 10 m² |
| Project cost | ₹1 lakh |
| Village / locality | Perunadu |
| Taluk / tehsil | Ranni |
| District | Pathanamthitta |
| State | Kerala |
| Location from | Site boundary on record |
| Our reference | WID-KL-02089 |
In context
12 applications in Pathanamthitta since January 2022 are in the same category (Telecom): 4 approved, 5 filed or under review, and 3 withdrawn, lapsed or rejected.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Perunadu, Ranni, Pathanamthitta, Kerala. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Jal Jeevan Mission: WSS to Nilakkal Sabarimala- Drinking water pipe line to… — forest land use approved, 1.1 km away
- Jal Jeevan Mission: WSS to Nilakkal Sabarimala- Drinking water pipe line to… — lapsed, 1.1 km away
- Sabari Lines Package - Construction of 220KV Double circuit line from Valupara… — in-principle approval, conditions pending, 7.3 km away
- Ullunkal Hydro Electric Project — initial checks, 8.2 km away
- Sabarimala Ropeway Project — decision issued, 8.3 km away
- Pamba Bus Station — lapsed, 8.4 km away
- Rebuild kerala Initiative-Flood damages 2018-Restoration of Nunungar Bridge in… — lapsed, 8.4 km away
- Construction of New Police Station at Pampa — under wildlife review, 8.5 km away
More from Mahesh Nair in Pathanamthitta
- Laying OFC from Maneera to Kokkathode BTS — initial checks
- Replacement of OFC from Chalakayam to Sabarimala — forest land use approved
- Laying of OFC from Moozhiyaar to Kakki — lapsed
- 4g Saturation Project for Uncoverd Villages of Pathnamthitta — in-principle approval, conditions pending
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.