What is this project?
Providing 4G/5G coverage to Uncovered Villages- Mannarkkad-CAT-2 USO is a lapsed telecom project in Agali, Mannarkad, Palakkad, Kerala. The site covers 0.5 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
No. The application was lapsed on 27 Sept 2023, so it is no longer under consideration.
Where is it?
In Agali, Mannarkad, Palakkad, Kerala.
How big is it?
It has a stated cost of ₹15 crore; a site of 0.5 acres and 2,200 m² of forest land.
When was it filed?
The application was filed on 12 Oct 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 27 Sept 2023 |
| Application filed | 12 Oct 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Land area | 2,200 m² |
| Forest land | 2,200 m² |
| Project cost | ₹15 crore |
| Village / locality | Agali |
| Taluk / tehsil | Mannarkad |
| District | Palakkad |
| State | Kerala |
| Location from | Site boundary on record |
| Our reference | WID-KL-02238 |
In context
13 applications in Palakkad since January 2022 are in the same category (Telecom): 3 approved, 3 filed or under review, and 7 withdrawn, lapsed or rejected. At 0.5 acres, this one is smaller than 85% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Agali, Mannarkad, Palakkad, Kerala. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Attappady Irrigation Project — under forest review, 2 km away
- Attappady Irrigation Project — returned to applicant, 2 km away
- Lift Irrigation scheme for Nellipathy Mettuvazhy Sarangamala Payara Area in… — initial checks, 4.9 km away
- ATTAPPADY GREEN ENERGY CORRIDOR PROJECT-220 kV LINE FROM VETTATHUR TO AGALI… — more information requested, 14.3 km away
- ATTAPPADY GREEN ENERGY CORRIDOR PROJECT-220 kV LINE FROM VETTATHUR TO AGALI… — more information requested, 14.3 km away
- Reconstruction of Basavian Check Dam & Canal System at Mukkali in Bhavani… — initial checks, 14.7 km away
- Providing 4G/5G coverage to Uncovered villages- Silent valley — more information requested, 15.2 km away
- Providing 4G/5G coverage to Uncovered villages- Silent valley — in-principle approval, conditions pending, 15.2 km away
More from Mahesh Nair in Palakkad
- Providing 4G/5G coverage to Uncovered Villages- Nemmara CAT-2 — forest land use approved
- Providing 4G/5G coverage to Uncovered Villages- Palakkad BA — lapsed
- Providing 4G/5G coverage toUncovered Villages- Palakkad BA — in-principle approval, conditions pending
- Providing 4G/5G coverage toUncovered Villages- Palakkad BA — application filed
- Providing 4G/5G coverage toUncovered Villages- Palakkad BA — lapsed
- Providing 4G/5G coverage to Uncovered Villages- Palakkad BA — application filed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.