Cleared for impact studyIndustry · Jalna, Maharashtra

Unit-3 Installation Of Ferro-alloy Unit To Manufacture 71,780 TPA (Ferro Manganese / Silico Manganese) By Installing 2x18 MVA Submerged Arc Furnace; And Installation Of Steel Plant To Manufacture 2000 TPD Billets And 2000 TPD TMT Bars.

Unit-3 Installation Of Ferro-alloy Unit To Manufacture 71,780 TPA (Ferro Manganese / Silico Manganese) By Installing 2x18 MVA Submerged Arc Furnace; And Installation Of Steel Plant To Manufacture 2000 TPD Billets And 2000 TPD TMT Bars is a proposed industrial project in Jalna, Maharashtra. The site covers 21.3 acres. Its stated project cost is ₹571 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 18 Oct 2022).

See it on the live map All projects in Jalna

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Unit-3 Installation Of Ferro-alloy Unit To Manufacture 71,780 TPA (Ferro Manganese / Silico Manganese) By Installing 2x18 MVA Submerged Arc Furnace; And Installation Of Steel Plant To Manufacture 2000 TPD Billets And 2000 TPD TMT Bars is a proposed industrial project in Jalna, Maharashtra. The site covers 21.3 acres.

Who is building it?

The applicant is Kapila Metals Private Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 18 Oct 2022), as of 27 Nov 2026.

Where is it?

In Jalna, Maharashtra.

How big is it?

It has a stated cost of ₹571 crore and a site of 21.3 acres.

When was it filed?

The application was filed on 18 Oct 2022.

Project details

StatusCleared for impact study
Status since18 Oct 2022
Application filed18 Oct 2022
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantKapila Metals Private Limited
Land area21.3 acres (8.6 ha)
Project cost₹571 crore
Village / localityJalna
Taluk / tehsilJalna
DistrictJalna
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-00622

In context

36 applications in Jalna since January 2022 are in the same category (Industry): 26 approved, 4 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 21.3 acres, this one is larger than 58% of them.

31 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Jalna, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Kapila Metals Private Limited in Jalna

All 3 Kapila Metals projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.