What is this project?
2 x 40T Induction Furnace for production of 3,96,000 TPA M.S. Billets & Rolling Mill for 3,88,080 TPA TMT Bars by Hot Rolled Process & 1,06,920 TPA by Reheating Furnace by Ved Steels & Alloys Private Limited is an approved industrial project in Jalna, Maharashtra. The site covers 20.2 acres.
Who is building it?
The applicant is Ved Steels & Alloys Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 3 Aug 2023), as of 27 Nov 2026.
Where is it?
In Jalna, Maharashtra.
How big is it?
It has a stated cost of ₹280 crore and a site of 20.2 acres.
When was it filed?
The application was filed on 3 Aug 2023.
Project details
| Official title | Proposed installation of 2 x 40T Induction Furnace for production of 3,96,000 TPA M.S. Billets & Rolling Mill for 3,88,080 TPA TMT Bars by Hot Rolled Process & 1,06,920 TPA by Reheating Furnace by Ved Steels & Alloys Private Limited |
|---|---|
| Status | Environmental approval granted |
| Status since | 3 Aug 2023 |
| Application filed | 3 Aug 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Ved Steels & Alloys Private Limited |
| Land area | 20.2 acres (8.2 ha) |
| Project cost | ₹280 crore |
| Village / locality | Jalna |
| Taluk / tehsil | Jalna |
| District | Jalna |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-02959 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 3 Aug 2023 (this page) | Environmental approval granted | 20.2 acres | ₹280 crore |
| Early planning filed 16 Feb 2023 | Cleared for impact study | 20.2 acres | ₹280 crore |
In context
36 applications in Jalna since January 2022 are in the same category (Industry): 26 approved, 4 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 20.2 acres, this one is larger than 53% of them.
30 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Jalna, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 2 x 40T Induction Furnace for production of 3,96,000 TPA M.S. Billets &… — cleared for impact study, 0 m away
- Unit-3 Installation Of Ferro-alloy Unit To Manufacture 71,780 TPA (Ferro… — cleared for impact study, 650 m away
- Abhay Industries — lapsed, 700 m away
- Manufacture of TMT Bars with capacity of 24 TPD Stand-alone Rolling… — more information requested, 700 m away
- Manufacture of TMT Bars, Angles, Channels, M.S. Strips & M.S. Pipes with… — more information requested, 700 m away
- Unit-2 Installation Of Ferro-alloy Unit To Manufacture 71,780 TPA (Ferro… — cleared for impact study, 950 m away
- Industrial Unit consisting of sponge iron (1000 TPD), MS Ingots/Billets (1000… — lapsed, 1.2 km away
- PROPOSED EXANSION of ROLLING MILL FOR PRODUCTION of TMT BARS from 5000 MTM to… — environmental approval granted, 2 km away