Quick answers
What is this project?
Unit-2 Installation Of Ferro-alloy Unit To Manufacture 71,780 TPA (Ferro Manganese / Silico Manganese) by Installing 2x18 MVA Submerged Arc Furnace; and Installation of Steel Plant to manufacture 2000 TPD Billets and 2000 TPD TMT Bars is a proposed industrial project in Jalna, Maharashtra. The site covers 21.9 acres.
Who is building it?
The applicant is Kapila Metals Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 18 Oct 2022), as of 27 Nov 2026.
Where is it?
In Jalna, Maharashtra.
How big is it?
It has a stated cost of ₹571 crore and a site of 21.9 acres.
When was it filed?
The application was filed on 18 Oct 2022.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 18 Oct 2022 |
| Application filed | 18 Oct 2022 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Kapila Metals Private Limited |
| Land area | 21.9 acres (8.9 ha) |
| Project cost | ₹571 crore |
| Village / locality | Jalna |
| Taluk / tehsil | Jalna |
| District | Jalna |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-00644 |
In context
36 applications in Jalna since January 2022 are in the same category (Industry): 26 approved, 4 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 21.9 acres, this one is larger than 61% of them.
27 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Jalna, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Industrial Unit consisting of sponge iron (1000 TPD), MS Ingots/Billets (1000… — lapsed, 250 m away
- Abhay Industries — lapsed, 300 m away
- Unit-3 Installation Of Ferro-alloy Unit To Manufacture 71,780 TPA (Ferro… — cleared for impact study, 550 m away
- Manufacture of TMT Bars, Angles, Channels, M.S. Strips & M.S. Pipes with… — more information requested, 650 m away
- Manufacture of TMT Bars with capacity of 24 TPD Stand-alone Rolling… — more information requested, 750 m away
- 2 x 40T Induction Furnace for production of 3,96,000 TPA M.S. Billets &… — environmental approval granted, 950 m away
- 2 x 40T Induction Furnace for production of 3,96,000 TPA M.S. Billets &… — cleared for impact study, 950 m away
- PROPOSED EXANSION of ROLLING MILL FOR PRODUCTION of TMT BARS from 5000 MTM to… — environmental approval granted, 1.2 km away
More from Kapila Metals Private Limited in Jalna
- Industrial Unit consisting of sponge iron (1000 TPD), MS Ingots/Billets (1000… — lapsed
- Unit-3 Installation Of Ferro-alloy Unit To Manufacture 71,780 TPA (Ferro… — cleared for impact study
All 3 Kapila Metals projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.