Quick answers
What is this project?
Induction Furnaces (Billets/Ingots/Hot Billets-5,28,000 TPA), Rolling Mill through Hot Charging (TMT Bars/Structural Steel-5,00,000 TPA) & Ferro Alloys Unit (FeMn-70,000 TPA/SiMn-56,000 TPA / Pig Iron-1,40,000 TPA) by Rajuri Steels & Alloys India Private Limited is a proposed industrial project in Mul, Chandrapur, Maharashtra. The site covers 39.5 acres.
Who is building it?
The applicant is Rajuri Steels & Alloys India Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Mul, Chandrapur, Maharashtra.
How big is it?
It has a stated cost of ₹300 crore and a site of 39.5 acres.
When was it filed?
The application was filed on 22 Jul 2024.
Project details
| Official title | Proposed Installation of Induction Furnaces (Billets/Ingots/Hot Billets-5,28,000 TPA), Rolling Mill through Hot Charging (TMT Bars/Structural Steel-5,00,000 TPA) & Ferro Alloys Unit (FeMn-70,000 TPA/SiMn-56,000 TPA / Pig Iron-1,40,000 TPA) by Rajuri Steels & Alloys India Private Limited |
|---|---|
| Status | Under environmental review |
| Status since | 22 Jul 2024 |
| Application filed | 22 Jul 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Rajuri Steels & Alloys India Private Limited |
| Land area | 39.5 acres (16 ha) |
| Project cost | ₹300 crore |
| Village / locality | Mul |
| Taluk / tehsil | Mul |
| District | Chandrapur |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-00958 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Early planning filed 22 Jul 2024 (this page) | Under environmental review | 39.5 acres | ₹300 crore |
| Early planning filed 2 Mar 2023 | Cleared for impact study | 71.9 acres | ₹300 crore |
In context
55 applications in Chandrapur since January 2022 are in the same category (Industry): 38 approved, 11 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 39.5 acres, this one is smaller than 80% of them.
20 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mul, Chandrapur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sponge Iron Plant (3x600 TPD) to produce 6,21,000 TPA DRI, 30 X 3 TG Set ,… — cleared for impact study, 0 m away
- Proposed Expansion and Modernization of existing 33,000 TPA Sponge Iron Plant… — cleared for impact study, 500 m away
- Proposed Expansion of DRI Kilns (Sponge Iron) from 33,000 TPA to 3,96,000 TPA… — cleared for impact study, 500 m away
- Environmental Clearance for the proposed Sponge Iron 180 TPD, 30 MW Power… — environmental approval granted, 500 m away
- 2X350 TPD DRI Plant for Production of 2,31,000 TPA of Sponge Iron, 2 X 40 T of… — environmental approval granted, 750 m away
- 2X350 TPD DRI Plant for Production of 2,31,000 TPA of Sponge Iron, 2 X 40 T of… — cleared for impact study, 750 m away
- Diversion of 1.15 HR. Zudpi jungle forest land for Construction of Captive… — lapsed, 850 m away
- Revalidation of prior EC of Mul -Akapur Sand Ghat, Area 1.80 ha, Gut. no. Mul… — environmental approval granted, 1.6 km away
More from Rajuri Steels & Alloys India Private Limited in Chandrapur
- Proposed Expansion of DRI Kilns (Sponge Iron) from 33,000 TPA to 3,96,000 TPA… — cleared for impact study
All 3 Rajuri Steels & Alloys projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.