Cleared for impact studyIndustry · Chandrapur, Maharashtra

Proposed Expansion of DRI Kilns (Sponge Iron) from 33,000 TPA to 3,96,000 TPA & WHRB based Power Plant 29 MW by Rajuri Steels & Alloys India Pvt. Ltd

Proposed Expansion of DRI Kilns (Sponge Iron) from 33,000 TPA to 3,96,000 TPA & WHRB based Power Plant 29 MW by Rajuri Steels & Alloys India Pvt. Ltd is a proposed industrial project in Mul, Chandrapur, Maharashtra. The site covers 24.7 acres. Its stated project cost is ₹764.3 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 5 Apr 2023).

See it on the live map All projects in Chandrapur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Expansion of DRI Kilns (Sponge Iron) from 33,000 TPA to 3,96,000 TPA & WHRB based Power Plant 29 MW by Rajuri Steels & Alloys India Pvt. Ltd is a proposed industrial project in Mul, Chandrapur, Maharashtra. The site covers 24.7 acres.

Who is building it?

The applicant is Rajuri Steels & Alloys India Private Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 5 Apr 2023), as of 27 Nov 2026.

Where is it?

In Mul, Chandrapur, Maharashtra.

How big is it?

It has a stated cost of ₹764.3 crore and a site of 24.7 acres.

When was it filed?

The application was filed on 18 Mar 2023.

Project details

Official titleProposed Expansion of DRI Kilns (Sponge Iron) from 33,000 TPA to 3,96,000 TPA & WHRB based Power Plant 29 MW along with Establishment of 54 MW Coal Based FBC Power Plant by Rajuri Steels & Alloys India Pvt. Ltd.
StatusCleared for impact study
Status since5 Apr 2023
Application filed18 Mar 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantRajuri Steels & Alloys India Private Limited
Land area24.7 acres (10 ha)
Project cost₹764.3 crore
Village / localityMul
Taluk / tehsilMul
DistrictChandrapur
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-02745

In context

55 applications in Chandrapur since January 2022 are in the same category (Industry): 38 approved, 11 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 24.7 acres, this one is smaller than 89% of them.

17 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Mul, Chandrapur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Rajuri Steels & Alloys India Private Limited in Chandrapur

All 3 Rajuri Steels & Alloys projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.