Proposed Expansion and Modernization of existing 33,000 TPA Sponge Iron Plant and 1,73,250 TPA M.S. Billets by installing 5x25 T IF to Produce 4,00,000 TPA Billets, 60 T EAF to produce 3,00,000 TPA Billets, Rolling Mill (HBC) to produce 5,00,000 TPA Long Products, Wire Rod Mill of 3,00,000TPA, Rolling Mill (RHF) to produce 4,00,000 TPA, SAF to Produce 70,000 TPA Ferro Alloys and 2 MW WHRB Power Plant

Proposed Expansion and Modernization of existing 33,000 TPA Sponge Iron Plant and 1,73,250 TPA M.S. Billets by installing 5x25 T IF to Produce 4,00,000 TPA Billets, 60 T EAF to produce 3,00,000 TPA Billets, Rolling Mill (HBC) to produce 5,00,000 TPA Long Products, Wire Rod Mill of 3,00,000TPA, Rolling Mill (RHF) to produce 4,00,000 TPA, SAF to Produce 70,000 TPA Ferro Alloys and 2 MW WHRB Power Plant is a proposed industrial project in Mul, Chandrapur, Maharashtra. The site covers 24.7 acres. Its stated project cost is ₹495.5 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 17 Apr 2025).

See it on the live map All projects in Chandrapur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Expansion and Modernization of existing 33,000 TPA Sponge Iron Plant and 1,73,250 TPA M.S. Billets by installing 5x25 T IF to Produce 4,00,000 TPA Billets, 60 T EAF to produce 3,00,000 TPA Billets, Rolling Mill (HBC) to produce 5,00,000 TPA Long Products, Wire Rod Mill of 3,00,000TPA, Rolling Mill (RHF) to produce 4,00,000 TPA, SAF to Produce 70,000 TPA Ferro Alloys and 2 MW WHRB Power Plant is a proposed industrial project in Mul, Chandrapur, Maharashtra. The site covers 24.7 acres.

Who is building it?

The applicant is Hella Infra Market Metal Private Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 17 Apr 2025), as of 27 Nov 2026.

Where is it?

In Mul, Chandrapur, Maharashtra.

How big is it?

It has a stated cost of ₹495.5 crore and a site of 24.7 acres.

When was it filed?

The application was filed on 10 Apr 2025.

Project details

StatusCleared for impact study
Status since17 Apr 2025
Application filed10 Apr 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantHella Infra Market Metal Private Limited
Land area24.7 acres (10 ha)
Project cost₹495.5 crore
Village / localityMul
Taluk / tehsilMul
DistrictChandrapur
StateMaharashtra
Location fromSite area on record
Our referenceWID-MH-05858

In context

55 applications in Chandrapur since January 2022 are in the same category (Industry): 38 approved, 11 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 24.7 acres, this one is smaller than 89% of them.

17 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Mul, Chandrapur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Hella Infra Market Metal Private Limited in Chandrapur

All 3 Hella Infra Market Metal projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.