Quick answers
What is this project?
Expansion of Integrated Steel plant Capacity from 10.0 MTPA to 14.8 MTPA at JSW Steel Ltd., Dolvi Works is a withdrawn industrial project in Dolvi, Pen, Raigarh, Maharashtra. The site covers 1,520.2 acres.
Who is building it?
The applicant is Jsw Steel Limited Dolvi.
Has it been approved?
No. The application was withdrawn on 12 Oct 2023, so it is no longer under consideration.
Where is it?
In Dolvi, Pen, Raigarh, Maharashtra.
How big is it?
It has a stated cost of ₹44,151 crore and a site of 1,520.2 acres.
When was it filed?
The application was filed on 9 Oct 2023.
Project details
| Official title | Expansion of Integrated Steel plant Capacity from 10.0 MTPA to 14.8 MTPA at JSW Steel Ltd., Dolvi Works located at Dolvi village, Raigad District, Maharashtra |
|---|---|
| Status | Withdrawn |
| Status since | 12 Oct 2023 |
| Application filed | 9 Oct 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Jsw Steel Limited Dolvi |
| Land area | 1,520.2 acres (615.2 ha) |
| Project cost | ₹44,151 crore |
| Village / locality | Dolvi |
| Taluk / tehsil | Pen |
| District | Raigarh |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-01557 |
In context
260 applications in Raigarh since January 2022 are in the same category (Industry): 152 approved, 67 filed or under review, and 41 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 1,520.2 acres, this one is larger than 95% of them.
20 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dolvi, Pen, Raigarh, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed 1 No of water pipeline, 3 No of Bridges, Cross-country Conveyors with… — coastal clearance granted, 250 m away
- Expansion of Integrated Steel plant Capacity from 10.0 MTPA to 15 MTPA at JSW… — returned to applicant, 1.1 km away
- Railway Line, Bridges and Water pipeline by JSW Steel Limited — more information requested, 1.7 km away
- Expansion of Integrated Steel plant Capacity from 10.0 MTPA to 15 MTPA at JSW… — environmental approval granted, 1.8 km away
- Expansion of Integrated Steel plant Capacity from 10.0 MTPA to 15 MTPA at JSW… — cleared for impact study, 1.8 km away
- Greenfield Cement Grinding Unit with Cement Production Capacity of 4.5 Million… — environmental approval granted, 2.8 km away
- Proposed Expansion of Dharamtar Jetty facility (Phase III) — environmental approval granted, 3.1 km away
- Proposed Expansion of Dharamtar Jetty facility (Phase III) — lapsed, 3.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.