Quick answers
What is this project?
50 Ktpa Iso-Propyl Alcohol Unit at Gail Petrochemical Complex Usar is a proposed industrial project in Ghotawade, Alibag, Raigarh, Maharashtra. The site covers 7.5 acres.
Who is building it?
The applicant is GAIL (India) Limited (GAIL).
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 28 Aug 2023), as of 27 Nov 2026.
Where is it?
In Ghotawade, Alibag, Raigarh, Maharashtra.
How big is it?
It has a stated cost of ₹9,864.1 crore and a site of 7.5 acres.
When was it filed?
The application was filed on 25 Aug 2023.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 28 Aug 2023 |
| Application filed | 25 Aug 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | GAIL (India) Limited (GAIL) |
| Land area | 7.5 acres (3 ha) |
| Project cost | ₹9,864.1 crore |
| Village / locality | Ghotawade |
| Taluk / tehsil | Alibag |
| District | Raigarh |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-02954 |
In context
260 applications in Raigarh since January 2022 are in the same category (Industry): 152 approved, 67 filed or under review, and 41 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 7.5 acres, this one is larger than 59% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ghotawade, Alibag, Raigarh, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.9488 Ha Forest Land for Construction of Polymer Truck… — lapsed, 1.3 km away
- Environment Clearance Design and Construction of 100 Seats Govt. Medical… — environmental approval granted, 1.4 km away
- Approach Road to Private land — lapsed, 5 km away
- Approach Road to Private Land — more information requested, 5.1 km away
- Diversion of Forest Land for Dismantling of the Existing Structurally Unsafe… — under forest review, 6.1 km away
- Proposed reconstruction of existing structure on plot baring Gat No 116/1/A/1… — returned to applicant, 7.4 km away
- Captive Passenger Jetty Terminal and Approach Road on West Coast Near Village… — recommended by coastal authority, 7.4 km away
- CRZ Clearance for Proposed construction of "Tourist Home" located at survey… — recommended by coastal authority, 7.5 km away
More from GAIL (India) Limited (GAIL) in Raigarh
- Capacity Augmentation Dahej-Uran-Dabhol-Panvel Natural Gas Pipeline DUPL-DPPL — initial checks
- Capacity Augmentation Dahej-Uran-Dabhol-Panvel Natural Gas Pipeline DUPL-DPPL — initial checks
- Capacity Augmentation Dahej-Uran-Dabhol-Panvel Natural Gas Pipeline DUPL-DPPL — under coastal review
- Diversion of 0.9488 Ha Forest Land for Construction of Polymer Truck… — lapsed
- Laying of Propane Pipeline from BPCL, Uran to GAIL Petrochemical Complex at… — coastal clearance granted
6 GAIL (India) (GAIL) projects in Raigarh
All 86 GAIL (India) (GAIL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.