Quick answers
What is this project?
Laying of Propane Pipeline from BPCL, Uran to GAIL Petrochemical Complex at Usar, Raigad is an approved pipeline project in Dolvi Dababa, Pen, Raigarh, Maharashtra. The site covers 174.3 acres.
Who is building it?
The applicant is GAIL (India) Limited (GAIL).
Has it been approved?
Yes. Its status is “Coastal clearance granted” (since 6 Sept 2023), as of 27 Nov 2026.
Where is it?
In Dolvi Dababa, Pen, Raigarh, Maharashtra.
How big is it?
It has a stated cost of ₹203.7 crore and a site of 174.3 acres.
When was it filed?
The application was filed on 14 Jun 2023.
Project details
| Status | Coastal clearance granted |
|---|---|
| Status since | 6 Sept 2023 |
| Application filed | 14 Jun 2023 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Pipelines |
| Applicant | GAIL (India) Limited (GAIL) |
| Land area | 174.3 acres (70.5 ha) |
| Project cost | ₹203.7 crore |
| Village / locality | Dolvi Dababa |
| Taluk / tehsil | Pen |
| District | Raigarh |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-17659 |
In context
19 applications in Raigarh since January 2022 are in the same category (Pipelines): 4 approved, 11 filed or under review, and 4 withdrawn, lapsed or rejected. At 174.3 acres, this one is larger than 85% of them.
13 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dolvi Dababa, Pen, Raigarh, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Cng Fuel Station on Land Bearing Survey No.40/1/1 Village Vadkhal,… — recommended by coastal authority, 3 km away
- Shambhala Petroleum — recommended by coastal authority, 3.1 km away
- Proposed construction of Conveyor Belt by JSW Steel Ltd. — more information requested, 3.9 km away
- Proposed Expansion of Dharamtar Jetty facility (Phase III) — environmental approval granted, 3.9 km away
- Proposed Expansion of Dharamtar Jetty facility (Phase III) — lapsed, 3.9 km away
- Proposed Expansion of Dharamtar Jetty facility (Phase III) — cleared for impact study, 3.9 km away
- Request for Change in User Agency Name from Adani Cementation Limited to Adani… — initial checks, 4.3 km away
- Berthing Jetty, Conveyor Corridor with Backup Storage Facilities and Approach… — environmental approval granted, 4.4 km away
More from GAIL (India) Limited (GAIL) in Raigarh
- Capacity Augmentation Dahej-Uran-Dabhol-Panvel Natural Gas Pipeline DUPL-DPPL — initial checks
- Capacity Augmentation Dahej-Uran-Dabhol-Panvel Natural Gas Pipeline DUPL-DPPL — initial checks
- Capacity Augmentation Dahej-Uran-Dabhol-Panvel Natural Gas Pipeline DUPL-DPPL — under coastal review
- Diversion of 0.9488 Ha Forest Land for Construction of Polymer Truck… — lapsed
- 50 Ktpa Iso-Propyl Alcohol Unit at Gail Petrochemical Complex Usar — cleared for impact study
6 GAIL (India) (GAIL) projects in Raigarh
All 86 GAIL (India) (GAIL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.